Laserfiche WebLink
Future traffic volumes op CR 15 oast of Orono Orchard Road are predicted m Hen-^epm <br />County’s long-range Transpoaation Sysiem Plan (TSP) to oe aoDfOximately 24 500 <br />vehicles by the year 2010. and app'ox mateiy 27,000 veh-des m the year 2020 The 20 <br />year projection constitutes a 30% increase 'O traffic over exist.ng volumes <br />Using Mn/OOI btaie A d Design C'lteria gu ceimes. roadway between 15.000 to <br />30.0000 veh-c'es per day are typically built with four travel lanes To reflect the limited <br />access nature of CR 15 east of Orono Orchard Road and the env ronmontai constra nts. <br />the roadway has been redesig'^ed as a s-rgie through lane m each direction, with a <br />center left turn lane for a inree lane cross-sect on <br />Intersection with Orono Orchard Rojj <br />The intersection of Orono O'Charo Road is d fficuii lor vehicles on Orono Orchard Road <br />and dangerous fer through traffic on CR 15 because of (1) sight lines. (2) speed of traffic <br />and (3) traffic vofurnes The intersection of Orono Orchard Road and County Road 15 <br />has safety limitat-ons because the sight distance between me norili on Orono Orciiard <br />Road and me west cn Cnrjnty Highway 15 is reduced by the curve on County Road 15 <br />Hennepin County has recognized the situation py planning to sign CR 15 for 35 mpn m <br />this area (source Hennepin County DPW) However, absent constant enforcement <br />traffic is likely to exceed the limit, based on the 50 mph iir^it between the 1-394 exit and <br />Woodhili Avenue on the similar CR 15 roadway cross section, tre improved pavmg cf <br />CR 15 and CR 15 ’ s proximity to a freeway exit ramp <br />In addition to sight distance restrictions and traffic speed, the 6C% increase m traff c <br />along County Road 15 over the past 20 years has resu'ted m extensive delays for <br />vehicles entering or exiting County Read 15 a: Orono Orchard Read a'^d created a <br />diUicull left turn situation <br />The increasing traffic foi'owmg reconsuuct'on of CR 15 w<il increase vehicle delay <br />between Orono Orchard Road and CR 15 Levels of Service (LOS) lo' Orono Orcfiard <br />Hoad left-turning vefndes are presently at LOS F during the weekday AV and PM peak <br />hour periods and summer weekends LOS F indicates the»e are msuMicient gaps of <br />suitable size to allow a side street maneuver to safely cross through mo CR 15 tra ’fic <br />stream in this case, Orono Orchard Road traffic on average waits over a minute for a <br />gap in CR 15 traffic to turn left As traffic continues to increase and gaps n tra'fic <br />decrease, drivers will lend to make crossing maneuver ^ ol CR 15 that may comp'omise <br />the " critical gap * safety arrxjunt. resuH ng m CR 15 iraific unexpectedly slowing oowri <br />by applyir^g their brakes and increasing the chances of accidents <br />Unsignaiizcd intersection LOS grades are estabi sfied by Highway Capacity Manual. <br />produced by the National Cooperative H.ghway Research Program and the Federal <br />Highway Admmistrat.on Grades run from “A’ (little or no delay) to "F (very tong <br />delays - demand exceeding capacity) <br />Woodhili Country Club members who live west and rxjrtn of the Country Club must new <br />use the Woodhili Road access Under the existing access structure, these members <br />currenfy take Orono Orchard Road to Ccuoty Road 15 Tney then make a left-hand turn <br />on to County Road 15 and anoiher lett-har>d turn from County Road 15 onto Woodhili <br />Road In exiting the Club, they make a nght-hand turn onto County Road 15 foUowed by <br />another right-hand turn onto Orono Orchard Road The approximately 30 turning <br />maneuvers per day per direction at this intersection resulting from Woodhili members <br />Ovr ti Cantury <br />fn§lnm9rlnf Xx9rlt*,ic«