My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-08-2004 Council Packet
Orono
>
City Council
>
2004
>
11-08-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 3:38:50 PM
Creation date
1/25/2023 2:05:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
\ <br />\ <br />Nina Wildman <br />September 10, 2004 <br />Page 2 <br />DRAINFIELD SITES PROTECTIVE COVENANTS <br />5) Subdivider shall develop covenants for each Lot forprotectionof drainfield sites within each <br />Lot. Covenants shall include protective language for alternate septic sites along with site plans <br />locating both primary and alternative sites. Subdivider shall include language alerting future <br />property owners of need to protect sites on adjacent properties. <br />ARCHAEOLOGICAL REVIEW <br />6) Subdivider shall submit evidence that the property contains no knovoi significant archaeological <br />features that would require preservation. (Contact State Historical Preservation Office) <br />PARK DEDICATION FEE <br />7) PaNTTient of standard 8% Park Dedication Fee per City ordinance (fee capped at S5,550 per <br />lot for Lots 2 and 3 based on value of each lot in excess of $69,375) Total due = $11,100; <br />Lot I as an existing residence is not subject to the Park Fee. <br />ROAD ACCESS <br />8) Applicant shall provide documentation sufficient to satisfy the City Attorney ‘hat the property <br />has legal roadway and utility easement access to Spring Hill Road and that the private road <br />system serving the property is within its dedicated easement corridors. The survey work by <br />Mark Gronberg dated 12-18-03 indicated that portions of tlie traveled roadway is not within its <br />dedicated corridor. This easement issue must be resolved before final plat approval wll be <br />granted. <br />9) Applicant sltall grant to tlie City an underlying Road, Drainage and Utility Easement for the private <br />loop road within Outlet A (Standard form attached for your attorney ’s use). <br />10) Applicant shall create a homeowners association for ownersltip and maintenance of Outlet A, since <br />it will serve up to three different properties. This shall include establishment of access easements <br />and maintenance covenants for the road within Outlet A (standard ‘Declaration of Private Road <br />Easement and Declaration of Maintenance for Same ’ is attached). <br />11) Applicant shall create an easement providing access for Lots 2 and 3 over Outlet B.
The URL can be used to link to this page
Your browser does not support the video tag.