My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-27-2004 Council Packet
Orono
>
City Council
>
2004
>
09-27-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 1:22:12 PM
Creation date
1/25/2023 1:14:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
August 18,2004 <br />Preliminary Scope of Work <br />Long Lakc-Orono TH 12 Turnback Project <br />INTRODUCTION <br />WSB and HKGi have put together a preliminary work program based on our <br />understanding of the Cities’ objectives for the TH 12 Turnback Study and our <br />understanding of the data and information that will be available to conduct the study. It <br />is our understanding that the objective of this study is to put together an overall concept <br />plan (layout) for old TH 12 through Long Lake and Orono that will facilitate the long <br />term land use visions of Long Lake and Orono for this con idor and that utilizes the <br />funding sources available in the best way possible for implementation of the plan. <br />The concept plan would include two components: a roadway layout plan and a <br />landscape/aesthctic design plan. The roadway layout plan will show numbet and widths <br />for through lanes, location. length and w idth of turn lanes; shoulder w idlhs; median <br />locations and widths; boulevard widths, trail and sidewalk locations and widths; existing <br />and proposed right-of-way; location of traffic signals; construction limits; and location of <br />retaining walls. The landscape/aesthetic design plan would show proposed land.scaping <br />or treatments for the area behind the curbs and if appropriate w'ithin the medians on the <br />roadway. <br />The roadway layout plan would incorporate the access, features and space that would be <br />needed to facilitate the cities* land use vision for the con idor while meeting County <br />design criteria. This would be accomplished tluough an iterative design process <br />involving ihc Cities and County. The land use overview/vision would provide the <br />framework for development of the roadway layout plan by defining where access is <br />needed, where trails or sidewalks are appropriate, and the type of space needed for <br />landscape or ae.sthetic design treatments. An initial roadway layout will be de\ eloped <br />incorporating these elements while attempting to meet County design criteria. WSB and <br />HKGi would work with the I II 12 Turnback Committee to develop this initial layout. <br />Once an initial plan is developed it will be presented to the County. It is anticipated that <br />se\eial iterations of the roadway plan will be needed to get to a plan th.it both the County <br />and the Cities can approve, fhe landscape/aesthetic design will be refined as consensus <br />develops on the roadway layout. Project costs will be developed and refined throughout <br />the process along with potential funding sources for different project elements to provide <br />a basis for City and County decision making. <br />Listed below are the tasks we believe are needed to accomplish the above objectives.
The URL can be used to link to this page
Your browser does not support the video tag.