My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-23-2004 Council Packet
Orono
>
City Council
>
2004
>
08-23-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 12:34:48 PM
Creation date
1/25/2023 11:45:54 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />CITY OF ORONO <br />2750 Kelley Parkway <br />PO Box 66 <br />Crystal Bay, MN 55323 <br />952.249.4600 <br />ZONING FILE 04-3034 <br />NOTICE OF PLANNING COMMISSION ACTION <br />D\TE OF NOTICE: August 17,2004 <br />TO: Aperfect Construction <br />314 Buchanan StNW <br />Minneapolis, MN 55413 <br />COPIES: Robert P. Mack <br />1650 North Farm Rd <br />Long Lake, MN 55356 <br />TYPE OF REQUEST: Conditional Use Permit <br />DATE OF MEETING: August 16, 2004 <br />Planning Commission recommended approval of the CUP with the following <br />recommendation: <br />The applicant must meet all of the requirements of the City Engineer as follows: <br />1. Metal fence posts should be specified for all silt fence installation due to the potential <br />of winter construction issues <br />2. Construction entrance detail plate is required. Included must be geotextile liner, size <br />of material accepted and minimum dimensions. 50 ’ long by 16’ width recommended. <br />3. Indicate locations of blanket on plan, all 3:1 slopes or steeper. <br />4. Indicate limits of clearing and grading, as well as any land disturbance on plan <br />5. Silt fence should be indicated around septic locations <br />6. In the SE corner of lot where concentrated drainage may be an issue, consider adding a <br />second wrapped row of silt fence to control concentrated flow issues <br />7. In NW corner of lot, consider wrapping the end of the silt fence towards the proposed <br />home to contain runoff conditions. Rather than abruptly ending the silt fence line. <br />8. Install silt fence on the north side of the driveway to control runoff situations. Tnere <br />is currently no storage volume for sediment laden water to store. <br />9. Note on plan locations for stockpiles and temporary control measures for stockpiles <br />during construction. <br />10. Under Erosion Control Note 4, change “send ” to “seed ”. <br />11. Under Erosion Control Note 3, indicate when removal of triangular silt dikes should <br />be completed. <br />12. Supply the city with the appropriate individual for a 24 hour emergency contact for <br />erosion control related issues. <br />13. WOren NPDES permit coverage is obtained, provide city with NPDES certificate of <br />coverage <br />14. Indicate who will be completing weekly ESC inspection log, and provide city with <br />weekly copies of such log. <br />VOTE:5 FOR 0 AGAINST <br />Applicant’s next scheduled meeting is confirmed as: <br />City Council - Monday, August 23,2004; Meeting starts at 7;00 pm <br />If you desire certified copies of the official Planning Commission minutes, they are <br />available from the City Recorder after review and approval by the Planning Commission. <br />If you have questions, please call City Planner, Melanie Curtis at 952.249.4627.
The URL can be used to link to this page
Your browser does not support the video tag.