My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-2004 Council Packet
Orono
>
City Council
>
2004
>
06-28-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 12:17:53 PM
Creation date
1/25/2023 10:31:39 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#04-3016 <br />May 14,2004 <br />Page? <br />9. Utility Locations and Availability <br />The property is proposed to be served by nuiiucipal sewer and water from Long Lake. The letter from <br />Long Lake Planner Jennifer Zierke indicates that these connections are possible, subject to <br />agreements to be made between Long Lake and Orono. Staff supports the concept of development <br />of this site as a PRD with sewer and water, even though it is within Orono’s defined Rural Area. <br />10. Utility Assessments or Connection Fees <br />The developer will be responsible for any sewer and water connection fees required by the City of <br />Long Lake, for the actual construction costs of any the lateral system serving the development, and <br />for any costs incurred by Orono (legal, etc.) as a result of the connections. <br />11. Conformity with Shoreland Regulations <br />The setback to the creek bank for Long Lake Creek for this sewered property is 75'. Wetland <br />setbacks of 26' must be adhered to. The MCWD may require greater setbacks or buffers for this <br />wetland, and developer should contact MCWD to determine this. The City Engineer has suggested <br />that the plan need to show the OHWL and floodplain boundary for the creek, and that the developer <br />submit the plans to the DNR regarding stormwater management. <br />12. Wetlands On Site and/or Impacted <br />The wetlands on the property were delineated a few years ago to help determine the amount of dry <br />buildable area. The City will require a Flowage and Conservation Easement over all wetlands <br />designated on the site. The proposed grading plan appears to avoid any impacts to wetlands. <br />13. Tree and/or Woodland Impacts; Steep Slope Impacts <br />The site is heavily wooded with a variety of i.*ee species. Orono does noc have a tree preservation <br />ordinance other than within the 0-75’ lakeshore and creek setback zone, where clearcutting and <br />removal of trees 6" or greater in diameter is prohibited. The developer has provided a Tree <br />Preservation Plan (Sheet 3 of 8) which indicates the areas where tree removal will occur on the site. <br />Tree removal and site regrading is proposed to occur in substantial areas of slopes ranging from 20% <br />to as much as 35%. The proposal is to shave the tep 4-6' of the knoll area and fill to create walkout- <br />style building pads with 4:1 (25%) maximum finished slopes. Staff has determined that the areas <br />to be graded do not meet the definition of “bluffs". However, the subdivision code definition of dry- <br />buildable area excludes slopes of greater than 18%. The City has in many past applications not <br />excluded such areas from the dry-buildable calculation, but has limited their development. An <br />example is the Cristofori Woods subdivision on Baysidc Road, in which “no residential construction <br />or land alteration ” was allowed on slopes greater than 18% (Resolution No. 3069, February 1992). <br />Exhibit P is a sketch of slopes exceeding 18% on the site. Imposition of such a limitation on this <br />application will have a sever impact on the viability of this subdivision.
The URL can be used to link to this page
Your browser does not support the video tag.