Laserfiche WebLink
r <br />d) Final landscaping design plan with planting schedules including numbers and <br />species, in accordance with the landscaping requirements of the B-6 zoning <br />district. <br />e) Final building construction plans. <br />f) Road and parking lot construction plans. A geotechnical evaluation of the soil <br />shall be done in conjunction with the pavement design and shall be submitted <br />to the City Engineer for approval.. <br />2.Easements. <br />3. <br />a) Drainage and Utility Easements shall be granted to the City of Orono over <br />all public utility lines and rights of way. <br />b) Drainage and Utility Easements shall be dedicated to the public on the <br />final plat 10' along all exterior property lines, and 5' either side of the interior <br />property line. <br />c) All required stormwater facilities to be developed on the site shall be <br />designated on the plat as drainage easements. <br />Developers Agreements. Applicant to execute Developer's Agreement for <br />construction of improvements in each of Lots 1 and 2 to ensure all site improvements <br />arc installed to City's specifications and satisfaction. Said Developers Agreement <br />may contain additional conditions not noted in this Preliminary Plat Approval <br />resolution. No land alterations can take place until erosion control is established and <br />the City is in receipt of a final grading and road plan. No improvements can begin <br />until City Engineer has approved all improvement plans. A Letter of Credit must <br />accompany a fully executed Developer's Agreement w-ntten to 150% of the cost of <br />the proposed site improvements, including landscaping. <br />Page 3 of 6