My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-24-2004 Council Packet
Orono
>
City Council
>
2004
>
05-24-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 8:57:34 AM
Creation date
1/25/2023 8:50:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The total recommended Stormwater Trunk Fee reimbursement amount is $148,109. We are <br />recommending payment of $84,240, at this time, which is the amount that has been collected <br />for Phase l.The remaining 563,949 reimbursement will be credited against Stormwater Trunk <br />Fees for future development phases. This $84,240 reimbursement cost will be funded from the <br />Stormwater Utility Fund and will require a budget adjustment for the 2004 Stormwater Utility <br />Fund budget. <br />Trunk Watermain Costs <br />The total Water Connection Fee for the entire development is $389,267 based on the 2003 Fee <br />Schedule. The total fee that will actually be paid will be in excess of this amount as the fees <br />for future phases will be collected at a higher future Fee Schedule rate. The Water Trunk Fee <br />collected for Phase 1 is $129,858. <br />There is $44,923 in additional costs to install a 12” versus an 8" trunk watermain in Kelley <br />Parkway which will provide a regional benefit to the Highway 12 water system. <br />The total recommended Water Connection Fee reimbursement amount is $44,923. This <br />reuubursement cost will be funded from the Water Utility Fund and will require a budget <br />adjustment for the 2004 Water Utility Fund budget. <br />Public Trails Cos's <br />The total Park Dedication Fee for the entire development is $526,500 based on the 2003 Fee <br />Schedule. The total fee that will actually be paid will be in excess of this amount as the fees <br />for future phases will be collected at a higher future Fee Schedule rate. The Park Dedication <br />Fee collected for Phase I is $175,500. <br />The requested cost reimbursement of $33,321 to construct the public trail along Willow Drive <br />and Highway 12 is acceptable, but will not be paid until construction of the trail is complete. . <br />Kelley Parkway Streetlights <br />The Kelley Parkway streetlights are required to be installed, at the developer ’s expense, <br />through an agreement between the City of Orono and Excel Energy for the installation and <br />long term maintenance of these lights. The City will than be responsible for the operation and <br />maintenance costs of the Kelley Parkway streetlights. <br />The E.xcel Energy Streetlight Agreement cost is $91,787 These costs will be reimbursed to the <br />City by the Developer as described in a subsequent section of this memo. The staff <br />recommendation is for approval of this agreement and payment of $91,787 to Excel Energy for <br />the Kelley Parkway Streetlights. These costs will be funded from the PIR Fund and will <br />require a budget adjustment for the 2004 PIR Fund budget. The installation of the streetlights <br />is planned to begin the week of May 24*^. <br />Page 2 of 4 <br />4
The URL can be used to link to this page
Your browser does not support the video tag.