My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-10-2004 Council Packet
Orono
>
City Council
>
2004
>
05-10-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 4:32:06 PM
Creation date
1/19/2023 4:24:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />2750 Kelley Parkway <br />P.O. Box 66 <br />Crystal Bay, MN 55323 <br />(952) 249-4600 <br />ZONING FILE: 04-3003 <br />NOTICE OF PLANNING COMMISSION ACTION <br />DATE OF NOTICE: April 21, 2004 <br />TO:Bruce & Kris Paddock <br />2700 E Medicine Lake Pkwy <br />Plymouth, MN 55441 <br />COPIES:George W. Stickney <br />2590 Countryside Drive <br />Orono, MN 55356 <br />TYPE OF APPUCATION:..........Jjat <br />DATE OF MEETING: April 19. 2004 <br />Planning Commission recommended as follows: <br />To approve the following staff recommendation with the noted minor wording revisions: <br />1. Only two new driveways are proposed on the private section of Fox Street and <br />proposed lot 3 must use the existing driveway that exists outside the Fox Street gates. <br />2. Proposed lots 1 and 2 should (not must) utilize the septic sites on the street side of the <br />proposed house pads rather than the lake side sites. <br />3. The average lakeshore setback line shown on the preliminary plat shall be the line <br />used to determine the average lakeshore setback for all 3 lots, not an average setback <br />that is determined by when which lots construct houses. <br />4. If the existing mound is proposed to stay during the interim period, a temporary <br />easement, expiring at the time of site grading for proposed lot I. may be permitted but <br />only by approval of the City. <br />5. Implementation of the recommendations of the City Engineer. <br />6. Implementation of the recommendations of the Minnehaha Creek Watershed District. <br />7. Submission and approval of the final plat. <br />8. Payment of standard fees and dedication of required easements. <br />9. Review by the Park Commission prior to City Council review. <br />VOTE:FOR 0 AGAINST <br />Applicant’s next scheduled meeting is confirmed as: <br />City Council - Monday, May 10,2004; meeting starts at 7:00 p.m. <br />If you desire certified copies of the official Planning Commission or Council minutes, <br />they are available from the City Recorder after review and approval by the Planning <br />Commission or Council. If you have questions, please call City Planner Janice Gundlach <br />at 952-249-4623. <br />J
The URL can be used to link to this page
Your browser does not support the video tag.