Laserfiche WebLink
'Piir' <br />Development 7ees - PUD #4 <br />April 8.2004 <br />Page 2 <br />In 1989, as a result of the 1987 CMP amendment, water and sewer facilities were constructed in the <br />Highway 12 area to provide capacity fortheexpecteddevelopmentnorthofHighway 12. These sewer <br />and water imits were not assessed to vacant property and are due as a unit connection charge upon <br />development. Up to and including 2000, this S&W connection fee was charged on a imii basis, and for <br />2000 was $3,645 per unit for sewer and $5,050 per unit for water, hi 2001 the fee was restructured to <br />be an acreage charge, based on gross acreage (including wetlands). For 2004, the sewer connection fee <br />is $5,510 per acre and for water is $9,110 per acre, foratotal S&W connectionchargeofS 14,620/acre. <br />The Sewa and Water Connection Charges that will be due for Lot 2, Block 1, City of Orono Addition, <br />are calculated as follows: <br />2.56 acres x $ 14,620.00 per acre = $37«427.00 <br />in. stormwater Drainage Trunk Fee <br />The clinic development will be subject to the City ’srecentlyenactedStorm Water TrunkFee. At the <br />current 2004 Fee Schedule commercial rate of $6,480 per acre, the site will be charged for 2.56 acres or <br />a total fee of $16)588.80. <br />! I i