My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-2004 Council Packet
Orono
>
City Council
>
2004
>
02-23-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 8:52:34 AM
Creation date
1/19/2023 1:20:52 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Constructive Ideas. Inc. <br />901 Jefferson Avenue. Suite 300 <br />St. Paul. Minnesota 55102 <br />(651) 225^740 • Fax 225-4741 <br />Project: Long Lake Fire Station <br />Orono. Minnesota <br />Architect: BKV Group <br />Minneapolis. Minnesota <br />Outstanding Items for Change Order No. 7 <br />Rochon <br />Item <br />7 <br />Type <br />Arch <br />Description <br />Add opening 224A to door schedule <br />Amount <br />7no nn Remarks <br />8 Arch <br />41 Arch <br />42 Elect <br />44 Arch <br />40 Arch <br />46 Arch <br />49r Owner <br />50 Mech <br />48 Arch <br />56 Owner <br />60 Owner <br />PR 23 Owner <br />59 Owner <br />62 Owner <br />54 Mech <br />52 Mech <br />55 Elect <br />Owner <br />Coordinate door - 3* on sched.. 3-6" on plan <br />Paint "Owner Installed" conduit connections <br />Rewire kitchen/refngerator from 120 to 208 volt <br />Change door hardware on toilet partitions <br />Expoxy floor finish in rooms ^20. 121. 123. 123A. 124 <br />Add furniture casters to podium at turn-out room <br />Added wiring for overhead door control locations <br />Added mechanical pads at Mezz <br />Add 1 1/4" strips to dispatch cabs for ADA <br />Renx)ve & replace curbs at parking - wiriter damage <br />Revise finish grading and sidewalk replacement <br />New door and sidelight at Hall 116 A Turnout <br />New countertop and sink <br />Rework Mitigation area per 5.E.H. <br />Speed controls for fans - PR«M9-ilem 2? <br />Integral thermostat - UH#1 • PRffS <br />Upgrade Make-up Air Unit <M • 30 amp to 60 amp <br />Change 4 door pulls per Fire Chief for key clearance <br />Total outstanding for Change Order No 7 ’ <br />111.00 <br />525 00 Conduit for pressure washer & C02 detection system <br />367.00 <br />118.00 <br />638.00 <br />37.00 <br />1.913.00 <br />646.00 <br />121 00 <br />2,961 00 <br />6.305.00 <br />3.14500 <br />1.235 00 <br />2.940.00 <br />31900 <br />213 00 <br />42500 <br />312.00 <br />Added location for overhead door controls <br />Curbs cracked and chipped by plowing and/or settlement <br />Revisions made to grading at North side of building <br />Added to keep smoke smell out of Admin area <br />Replace top where hole was drilled at Orono’s inspector direction <br />Changes required alter Aug 1. 2003 per Mr Miller’s complaints <br />New Item - just showed up with “claim package" 12/17/2003 <br />New Item - just showed up with "claim package" 12/17/2003 <br />New Item - just showed up with "claim package" 12/17/2003 <br />23.113 00 <br />mk
The URL can be used to link to this page
Your browser does not support the video tag.