Laserfiche WebLink
I <br />“ \ <br />\ / <br />// <br />GITYoT ORONO <br />MuiiidfMl Offices <br />Strati MMntt: <br />2750 IWtiy Parkway <br />Orono. MN 55356 <br />P.O. Bn 66 <br />Crystal Bay. MN 55323^6 <br />December 31,2003 <br />Robert Byers, P.E. <br />Senior Transportation Engineer <br />Hennepin County Transportation Department <br />1600 Prairie Drive <br />Medina, MN 55340-5421 <br />Dear Bob: <br />I was very surprised when I received a copy of your December 19 letter to Jennifer Zierke, the <br />Long Lake City Planner, regarding a design ahemative for a dedicated westbound left turn lane <br />to West Industrial Boulevard. The Cities of Orono and Long Lake have been working with you <br />for many months in a careful and deliberate effort to develop design solutions for the turn-back <br />of Highway 12. Since we had not met for a number of months, 1 assumed your time was being <br />taken up by other project demands. <br />I am very concerned that there was no conununication with Orono throughout the entire process <br />of your preparing a design alternative based on input from the City of Long Lake in July and <br />August of this year. It is important that the design process for the Highway 12 turn-back be a <br />cooperative process between the County and the Cities of Long Lake and Orono, and that open <br />communication be maintained between all parties at every step of the process. <br />Sincerely, <br />-------------- <br />Ronald J. Moorse <br />City Administrator <br />CC: Long Lake City Council <br />Orono City Council <br />lUcpiMwc (9S2) 24M6M • Fas(«S2)24M61i <br />wwwxioroiKMnii.n <br />1f <br />s <br />fi Till I in 111 iraMwgriT~i If i i ~>ir m i