My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-03-2004 Council Work Session
Orono
>
City Council
>
2004
>
08-03-2004 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 12:21:22 PM
Creation date
1/19/2023 12:19:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c <br />I <br />c <br />1 <br />fi <br />regarding the design of the roadway, and secondly, will assist the cities in working with Hennepin <br />County to get as close to the desired design as possible. <br />Fundins for Street Rehabilitation <br />In order to balance the 2004 budget within the levy limit, the amount budgeted for street <br />rehabilitation was reduced from $97,000 to $30,000. The 2005 budget restores $49,500 of this <br />reduction. This is reflected in the increase in the Infrastructure levy from $35,450 to $85,950. The <br />City has a number of local roads, that are rot eligible for State funding, that will need to have major <br />rehabilitation in the coming years. Two examples are Casco Point Road and Orono Orchard Road. <br />We need to begin to set aside funding for these needs. <br />MltiB
The URL can be used to link to this page
Your browser does not support the video tag.