Laserfiche WebLink
c <br />c <br />Superintendent position, a number of new priorities in the water and sewer areas have been identified. <br />If we want to make day-to-day park maintenance a higher priority. \ e need to assign that responsibility <br />to a specific person. Since park maintenance is largely a seasonal need, it is most cost-effective to <br />address this need with a seasonal maintenance position. <br />New Public Works Staffing <br />With the elimination of the Public Works Superintendent position, the Public Works Department has <br />been operating with a Public Works Director and two interim working foremen. This structure has <br />facilitated much discussion about priority public works maintenance needs. It has also facilitated <br />substantially increased productivity. The needs in the areas of stormwater drainage, improved <br />maintenance of the water system (i.e. initiating a regular program of hydrant flushing and repairs of <br />water shut-off valves) and improved maintenance ot the sewer system (i.e. increased monitoring of lilt <br />stations, and increased cleaning and televising of sewer lines) arc well beyond the capacity of the <br />current staffing level. At minimum, an additional full-time maintenance position is needed. <br />The cost of a full-time maintenance position, and of the additional pay level of the two working <br />foreman positions, is equivalent to the cost of the former Public Works Superintendent position. The <br />additional maintenance position can be added without increasing costs. <br />I.T. Training <br />As the management team has met to develop priorities, tlic number one identified need is to strengthen <br />our information tecimology capabilities. As indicated above, one key to this is to provide more time for <br />the I.T. Coordinator to deal with I.T. needs. Another key is to provide training to increase staff's I.T. <br />capabilities. Several years ago, the City purchased a software system to provide a broadly integrated <br />information system based on a property data base. The system has been very effective in automating a <br />number of manual infonnation systems. However, we are cunently using only a small portion of the <br />system’s capabilities. In order to expand our use of the system’s capabilities, we need to obtain <br />additional training regarding how the data base is structured and how the data screens are formatted. <br />This will allow us to customize the system to our needs without paying a consultant. <br />In addition, the City’s applications all run in a network environment. Currently, wc rely on LOGIS to <br />troubleshoot network problems. Although LOGIS charges a reasonable rate for this service, the costs <br />do add up. It would be more cost-effective and more timely to have this capability in-house. The <br />proposed budget includes network training for the I.T. Coordinator to broaden his network <br />administration capabilities. <br />Highway 12 Turnback Consultant <br />The Cities of Long Lake and Orono ar. w orking through a joint task force to develop a plan for the <br />design of current highway 12 when it is turned back from Mn/DOT to Hennepin County. The turnback <br />is an opportunity to re-thirik the function and design of the roadway. The task force has detennined that <br />it needs the assistance of both a transportation planning consultant and a landscape dcsiga'urban <br />planning consultant. These consultants will first assist the task force in addressing the key issues