My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-21-1992 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1992
>
09-21-1992 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 10:10:10 AM
Creation date
1/19/2023 10:00:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning File #1764 <br />September 18, 1992 <br />Page 2 <br />3. <br />4. <br />r <br />5. <br />6. <br />7. <br />8. <br />writing) and the flood plain elevation (established at elevation 931.5 <br />based on the culvert contiguity with Stubbs Bay). If the floodway is <br />defined at an elevation near 930.0 or higher, the flood fringe credit <br />may not be available. <br />Under the assumption that enough flood fringe area is available to <br />meet the 2 acre lot area requirement, the proposed lot boundaries <br />allow for adequate area and width for this to be a legitimate building <br />site, although it at first viewing would be perceived as relatively <br />low land. There is a liJcely buildable envelope approximately 120' <br />deep and 130' wide. One other unresolved concern is, if the 929.4 <br />contour continues from Stubbs Bay through the culvert and up the <br />creelc, whether a 75' setback must be required. If so, this would <br />reduce the building envelope width to perhaps 115', still leaving <br />substantial area to develop a residence. <br />The property abuts municipal sewer, and is within the MUSA boundary as <br />recently amended. Only one sewer unit was assessed to the property, <br />intending to serve Lot 1. A stub can easily be provided to serve Lot <br />2. <br />City policy is to collect the second sewer unit at the time a building <br />permit is issued for the second residence on the property, regardless <br />of which lot the second house is built on. <br />The Orono Park Commission has requested that, in addition to the <br />standard park dedication fee, a 10' bike trail easement be granted <br />over the 10' drainage and utility easement adjacent to Bayside Road. <br />The park fee would be adjusted to compensate for the easement. <br />A copy of the proposed plat has been forward to Hennepin County <br />Department of Transportation for review of a driveway location for Lot <br />2. We have no response as of this writing. The City Engineer notes a <br />potential concern on driveway location and sight distance, hence any <br />recommendation for approval must be contingent on driveway location <br />approval from Hennepin County. <br />The City has requested an easement through Lot 1 for municipal sewer <br />lines extending northwestward to serve the house at 185 Landmark <br />Drive. The originally proposed easement location was down the old <br />driveway corridor through the center of the lot. Applicant has <br />discussed with Public Works a relocation of that easement to reduce <br />the impact on Lot I's building site. <br />Since Bayside Road is considered a scenic parkway but not an arterial <br />road within the Comprehensive Plan, there is no requirement that <br />access to Lot 2 be provided by an interior roadway system.
The URL can be used to link to this page
Your browser does not support the video tag.