Laserfiche WebLink
CONSTOUCnON COST ESTIMATE <br />t ote •ICE ARENA <br />Ccxm. No. 9201 <br />t-* <br />• 'rWi' ■ <br />Div. 5. Steel <br />Includes quality pre*'engineered steel <br />frame, roof and sidewall upper facia with 4" <br />insulation, gutters and misc. steel. <br />$ 309,500.00 <br />Div. 6.Carpentry . <br />Includes allowance for miscellaneous <br />25,000.00 <br />carpatry, drywall partitions and <br />framing. <br />Div. 7. Moisture Protection <br />Includes perimeter insulation and <br />caulking. <br />15,500.00 <br />Div. 8. Doors and Windows <br />Includes heavy duty exit doors, <br />interior doors, overhead doors, <br />windows and hardware. <br />58,800.00 <br />rv f f,-') <br />. ii. <br />Div. 9. Finishes <br />Includes ceiling in toilets and <br />meeting rooms, skate tile, painting, <br />and trim. <br />58,000.00 <br />Div. 10. Specialties <br />Includes toilet partitions and bath <br />accessories, .ben^s, concession, <br />and 1,000 seat bleachers. <br />e • e <br />85,600.00 <br />i?.» <br />Div. 11. Special Construction <br />Includes ice rink .system, with concrete <br />floor, subsoil heat, ddumidifer and <br />dasher boards. <br />• • e <br />;■ j. <br />390,000.00 <br />142,650.00Div. 15. Mechanical . <br />Includes service and plumbing,, fire <br />sprinkler system, radiant and unit heating <br />system, and eadhaust system. <br />Oiv. 16.Electrical <br />Includes service, 50 plus foot candle <br />lighting, and minimal power distribution <br />and auxiliary lighting, sound and <br />scoreboard. <br />136,000.00 <br />TOTAL CONSTRUCTION COST ESTIMATE $1,772,550.00 <br />-V. <br />10. <br />mm <br />1i <br />1 <br />#1