Laserfiche WebLink
r ■ * <br />Vi <br />'--■?■•.'k <br />* V■ ■• <br />1 <br />OONSTOUCTTON COST ESTIMATE <br />ORONO ICE ARENA <br />Comoi. No. 9201 <br />The following cost estimate is based on area takeoff and unit prices <br />as would be provided by subcontractors to the project. The project <br />wDuld.be built by a general contractor providing co*ordination, <br />supervision, and control. <br />The cost estimate is fo^- a complete build^ on a fully developed site. <br />Alternate materials and systems are identified with estimated costs. <br />The cost estimate is broken down by specifications division which can <br />relate to subcontracts. <br />Div.1. General Conditions <br />Allowance for costs related to general <br />contractor for supervision, equipment, <br />permits, review fees, insurance, <br />temporary facilities, and testing. <br />$ 59,000.00 <br />Div. <br />! I. f'/ ^ <br />' ,■ <br />2. Site Work <br />Excavation, backfill and grading <br />Includes excavation to basil soils <br />under building and compacted back fill <br />with coarse alluvial soils from off <br />site. Fill and grading of .avhrall <br />site. Footing excavation and backfill, <br />under floor sand cushion. <br />- 61,000 <br />302,100.00 <br />- P :■ <br />Tl Parking lot and drives . <br />Class 5 base, paving, curbs and <br />entrance walks. <br />- 98,500 <br />. V.-. <br />Landscaping Allowance <br />Seed, sod, and trees. <br />- 5, <br />Site Lighting Allowance <br />Watt'.r and Sewer Service <br />To Old Crystal Bay Road connectors <br />thru school property. <br />- 8,000 <br />•129,600 <br />Div. 3.Concrete <br />Includes footings, columns, perimeter <br />floor slab and precast mezzanine. <br />122,000.00 <br />Div. 4.Masonrv' <br />Includes concrete block foundation and <br />interior partitions and insulated <br />energy rockface block exterior wall to <br />10 feet. <br />68,400.00 <br />-s <br />4- <br />i <br />i <br />■M