My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-17-1992 Planning Packet
Orono
>
Planning Commission
>
1992
>
08-17-1992 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 9:26:22 AM
Creation date
1/19/2023 8:59:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
p <br />MINUTES OF THE ORONO PLANNING COMMISSION MEETING <br />HELD MAY 18, 1992 <br />ZONING FILE #1737 - CONT. <br />Mabusth explained the updated survey showing the existing <br />improvements on the property. She compared the survey to the one <br />done in 1974. The garage addition done In 1974 was in the 75’ <br />setback area and the open deck was considered a non-encroachment. <br />Since that time, there was a permit Issued In 1982 which allowed <br />the deck to be enclosed and second story additions and additional <br />decks. The additional decks were destroyed in the 1987 "super <br />storm”. The applicant applied for storm damage repairs under the <br />emergency ordinance. The decks were reconstructed. Sometime In <br />1990-91, the Inspectors noted the gazebo and lakeside deck. <br />Hollander noted that it was built In 1974 and Is in need of some <br />repalr. <br />Indritz noted that this is an after-the-fact request to maintain <br />the gazebo and lakeside deck structure. He noted that It is <br />Hoi lander’s content ion that these structures have been in existence <br />prior to Orono’s adoption of Its current ordinances and therefore <br />are grandfathered in. He reviewed photos of damage done to these <br />structures in 1987. He stated they have witnesses that can testify <br />to their knowledge of the construction of these Improvements. He <br />explained there was renovation dona after the storm damage, but was <br />merely reconstruction of a portion of the existing gazebo. The deck <br />wasn’t damaged severely and did not require much reconstruction. <br />He explained that Mabusth has pointed out that the permit issued <br />in 1974 for the addition of the garage, there was an ordinance that <br />prevented the construction of principal residences within 75’ of <br />the lakeshore and that is what the variance was for. A portion of <br />the addition was within that zone. Indritz assumed that because <br />there wasn’t an ordinance governing decks within that zone, the <br />deck was not included on the site plan. Additional construction <br />was done to the principal structure, all of which was done in <br />conformity to the ordinances in effect at the time. There is no <br />documentation on file to show when the gazebo and lakeside deck <br />structui“e was constructed, but his cl lent contends they were <br />constructed In 1974. The permit issued in 1982 was to reconstruct <br />the principal residence destroyed by fire and to enclose the deck <br />area and add additional decking. <br />Mabusth noted that the 1982 permit allowed the deck to be enclosed. <br />She explained that currently residents are not allowed to increase <br />the Intensity of a non-conform!ng structure, but back in 1982 whey <br />were allowed to do so. <br />Johnson asked what required a permit in 1974
The URL can be used to link to this page
Your browser does not support the video tag.