Laserfiche WebLink
i, <br />MINUTES OF THE <br />ORONO aTY COUNCIL MEETING <br />Monday, November 28,2005 <br />7:00 o’clock p.m. <br />(CharUc James, Coatlaued) <br />Gaflnm stated it is Staffs anticipation that the stripping and stockpiling of the topsoil would conunence <br />almost immediately, with fill being brought to the site in the spring. <br />Murphy stated Ames Construction would prefer to haul the dirt to the site here in Orono rather than <br />Delano or Independence. Murphy stated the topsoil would be scraped off the top of this site and moved to <br />the side while the fill is being hauled in. <br />White inquired how the grade on this site would change. <br />Gaffron stated he has not received ample information to address the change in grade and some of the <br />other ctmcems raised tonight. Gaffron stated it could be a few weeks before the appropriate information <br />is provided. <br />Moorse stated the developer has been told that they are not to be filling this lot up high enough to create <br />walkout lots. <br />White expressed a concern about the appearance of the lot while the stockpiling was occurring. <br />Murphy stated he had the understanding that Ames was going to be the applicant and would be paying the <br />fees and obtaining the conditional use permit. <br />Gaffion stated Ames is the applicant. <br />Murphy pointed out that there really is no connection between Ames and the property owner but that this <br />is an opportunity to place some fill in an area that needs to be brought up to grade and provide additional <br />dirt for a berm for screening but that the amount of fill would be controlled. Murphy stated he was <br />unaware of the lack of information submitted. Murphy suted he would be happy to speak with the <br />contractor about this situation. <br />Gaffron stated Ames should work with the property owner on the temporary fill plans for this lot. <br />Murphy stated he is confident that Ames Construction would take the appropriate steps to deal with <br />possible erosion and some of the other issues and that he would be supportive of the permit if Ames <br />Construction provides the required documentation. <br />McMillan inquired what kind of protection the homes in the immediate area would receive. <br />Gaffron stated there are some limits to what protections can be placed on the hauling in of the fill and that <br />there likely are going to be some impacts to the neighboring propierties. Gaffron stated the City can <br />require mulch, seed and hay on the fill, but that there may be times when there is not vegetation growing <br />on the dirt and that there may be an issue witii dirt blowing. <br />PAGE 6 <br />_____