My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-2005 Council Packet
Orono
>
City Council
>
2005
>
12-12-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 2:21:47 PM
Creation date
1/12/2023 1:59:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
laserfiche2
Created:
1/12/2023 2:21 PM
Modified:
1/12/2023 2:21 PM
Text:
http://www.bonestroo.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L:- <br />l-A <br />m J Bonestroo <br />Rosene <br />Anderllk& <br />Ivll Associates <br />Engineers & Architects <br />2335 West Highway 36 • St. Paul, MN 55113 <br />Office; 651-636-4600 • Fax: 65I-636-I3II <br />www.bonestroo.com <br />September 13,200S <br />Mike GafTron <br />Planning Director <br />City of Orono <br />Post Oflice Box 66 <br />Ciystal Bay, MN 55323 <br />Glendale Cove (177 Glendale Drivc/190 Willow Drive North) <br />File No. 000139-05000-0 <br />Plat No. 05-3131 <br />Dear Mike; <br />We have reviewed the revised preliminat^* plat and revised preliminary grading and drainage plans dated 9-8- <br />OS for the pn^aed 10-lot residential subdivision. It appeals that the subdivision will now consist of an outlot, <br />8 new homes, one existing home and a lot created for die existing church. The site is located in the southeast <br />quadrant of the intersection of Glendale Drive and Willow Drive North. We have the following comments in <br />regards to engineering matters. <br />1. Access/Streets: A geotechnical report, R-value recommendation and pavement design should be <br />submitted for review and approval. Final plans should include all applic^le standard details for street <br />construction. All driveway grades shall be 10% or less. <br />2. Grading and Erosion Control: Final plans should include a Storm Water Pollution Prevention Plan in <br />accordance with Minnesota Pollution Control Association rules. The grading plan should be consistent and <br />show swales centered on common lot lines between homes as shown between Lots 4 and 5. The grading <br />plans should provide 2-feet of fieeboard between the high water levels of any pond or wetland and the <br />lowest expos^ opening to any home adjacent to the pond or wetland. This will require raising the <br />proposed walkout elevations to at least 996.1 for Lots 8,9, and 10. The street elevations proposed along <br />the church side across from Lots 8 and 9 will dam water on the church property. The plans should be <br />revised to include storm sewer or the street grades should be revised. The plans should also include <br />wetland mitigation information for the proposed wetland impacts. <br />3. Sanitary Scwer/Water Main: Final plans should include a detailed sanitary sewer design. Plan and <br />profile views should be provided for ali proposed sanitary sewer improvements. Tlie ability to obtain <br />municipal water from Long Lake should be explored. If municipal water is available final plans should <br />include a detailed water main design including plan and profile views over all improvements. <br />4. Storm Scwcr/Drainage: Drainage area maps and drainage calculations should be submitted for review <br />and approval. Plans should be submitted to Minnehaha Creek Watershed District for review and approval. <br />Final plans should include storm sewer calculations and detailed storm sewer design including plan and <br />profile views of all proposed storm sewer improvements. The fuial storm water pond design shall meet <br />NURP standards. <br />5. Plat: The final plat should provide drainage and utility easements 10-feet wide along all exterior lot <br />lines and 5-feet wide along all interior lot lines. Drainage easements should be provided over all ponding <br />areas, wetlands and drainage ways. <br />6. Ffnancial Guarantee: When the final plans are completed we will prepare a cost estimate for the site <br />St Paul. St. Cloud. Rochester, MN • Milwaukee, Wl • Chicago, IL <br />ArrinMtIra Ac U mVCW** OpM'tunKy Cm«>l«|rw and Owndd
The URL can be used to link to this page
Your browser does not support the video tag.