Laserfiche WebLink
M54I3I <br />December <2005 <br />Pm|c6 <br />a *B Minor Arterial”). The only lots proposed to access other than from the proposed new road <br />are the existing church and the Williamson residence. It would not be appropriate to require the <br />church to access onto this new residential street, and the Williamson home is oriented such that <br />re-directing its access off of Willow would be unreasonable and serve no real purpose. <br />I. Road Improvements and/or Easements Needed <br />Planning Commission has recommended that the new road be a private cul-de-sac road. This is <br />reasonable, even though this is becoming an “urban” area of the City, because of the rezoning to <br />RPUD and because only a small number of homes will be served, with minimal potential for <br />connection through to another road. However, underlying City road and utility easements should <br />be granted, so that if the church property is someday further developed and connects a through <br />road to Glendale Drive, the option to make it public will exist. Because this will be an urban <br />development, the City will ultimately own and maintain the sanitary sewer lines (and City water <br />mains, if provided). <br />J. 10% Recreation Area Requirement <br />The RPUD standards in Section 78-626(11) require that "each RPUD development shall provide <br />a minimum of ten percent of the gross project area in private recreational uses for project <br />residerUs. Such area shall he for active or passive recreational uses suited to the needs of the <br />residents of the project, including swimmimg pools, trails, nature areas, picnic areas, tot lots <br />and saunas. Private recreational areas requirements are in addition to the standard park <br />dedication requirements." Planning Commission determined that the church lot is not considered <br />part of the RPUD development, meaning that O.S acre must be devoted to private recreation area. <br />Planning Commission concluded that the 0.26 acre Outlet B, combined with the provision of the <br />applicant ’s proposed public pedestrian and bike trail extending along the private road and <br />through the church property to Glendale Drive, would be sufficient to meet the private recreation <br />area requirement, as long as the developer constructs that trail at the developers cost. A Willow <br />Drive trail crossing fix>m the private toad to Elm Lane should be provided (striping, signage). <br />K. Paric/Trail Easements or Dedication Needed <br />The Orono Comprehensive Trail System Plan indicates a future connection from the Highway 12 <br />corridor trail down Willow to Hackberry Park. It has not been previously determined whether <br />this trail would be on the east or west side of Willow. The Park Commission reviewed this and <br />recommended that a 10 ’ easement be taken along the entire Willow Drive frontage. Whether <br />this trail segment should he constructed now by the devel^r (from the north end of the <br />iwoperty to the private road) is an Uem for further discussion. If so, the developer would likely <br />request a park fee credit. <br />The 8 new lots will be subject to the standard 8% park dedication. The residential Paric Fee is <br />currently established with a min-max fee of $32S0-$SSS0 per lot.