My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-2005 Council Packet
Orono
>
City Council
>
2005
>
09-26-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 1:59:12 PM
Creation date
1/12/2023 1:23:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8, <br />B. <br />C. <br />D. <br />E. <br />F. <br />O. <br />H. <br />Completion Date - All Improvements shall be completed no later than (2 years <br />from commencement date). The Developer may, however, request an extension <br />of time from the City. If an extension is granted, it shall be conditioned upon <br />updating the security posted by the Developer to reflect cost increases and the <br />extended completion date. <br />Contractors - The Developer shall select, retain and supervise the contractor's) <br />responsible for construction of the Improvements. The City roserves the right to <br />require satisfactory proof of successful experience and adequate financial status of <br />each such contractor. Where required by City ordinance, the contractor shall first <br />obtain a license from the City. <br />Pre-Construction Conference - Prior to the start of any construction, the <br />Developer and the developer’s contractor shall meet with the responsible City <br />officials to review construction plans and schedules. <br />Permits - Prior to the start of any construction, the developer’s contractor shall <br />apply for and receive all necessary permits for the Improvements from the City <br />and/or government agencies having juri xliction. Site grading shall not commence <br />until a land alteration permit has been issued. Developer is advised that an <br />erosion control permit must be obtr'ned from the Minnehaha Creek Watershed <br />District as well as the required NPDES construction site permit, before <br />commencing any grading activity on the site. <br />Construction - The construction, installation and materials shall be in accordance <br />with the Plans approved by the City. <br />Inspection - The City, through its staff and/or consultants, shall inspect the <br />installation of the Improvements to ensure compliance with the Plans. The cost of <br />such inspections will be paid by the Developer anticipated to be about $5,000.00 <br />to $10,000.00, but if there are major problems it could be as high as $20,000.00 <br />per City Engineer consultant <br />Insurance - The Developer will cause each person who constructs and installs any <br />portion of the Improvements to maintain complete insurance coverage including <br />Workmen ’s Compensation, Liability and Property Damage (with coverages <br />consistent >vith industry standards). <br />Pcrfomance Security. For the purposes of assuring to the City that the Improvements <br />will be completed according to the terms of this Agreement, and that the Developer will <br />pay or will cause to have paid all claims for work done and materials and su|^Iies <br />furnished, the Developer or its general contractor will deposit with the City prior to <br />issuance of site grading and building permits an irrevocable letter of credit (LOC) from <br />a local (Twin Cities area) financial institution in a form satisfactory to the City, providing <br />Developer Initial_____ <br />PageSorO <br />City Clerk Initial.
The URL can be used to link to this page
Your browser does not support the video tag.