My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-2005 Council Packet
Orono
>
City Council
>
2005
>
09-26-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 1:59:12 PM
Creation date
1/12/2023 1:23:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. <br />Y. Side Elevation sheet A-7 <br />Z. Monument Signage <br />The Plans are subject to any additional requirements of the Minnehaha Creek Watershed <br />District and subject to any additional requirements and conditions specified by the City <br />Engineer upon review of the Plans. Construction of the buildings shall be in <br />conformance with the building codes and regulations adopted by the City. Any <br />substantial changes to the gross square footage, fooqmnt/wall/roof dimensions or defined <br />building height shall require a prior amendment to tlris Agreement <br />improvenents: In accordance with the policies and ordinances of the City, the <br />following described public or private improvements (hereinafter collectively called the <br />"Improvements**) shall be constructed, installed and maintained by the Developer <br />according to the terms and conditions contained in this Agreement: <br />A.Site grading, roadways and driveways, curb and guttCT, parking lots, sidewalks, <br />retaining walls and all necessary erosion control measures per the Overall <br />Grading and Drairuige Plan and the individual building grading and drainage <br />plans (hereinafter called "site grading improvements"); <br />B.Construction of sanitary sewer and water coruiections, and construction of storm <br />sewer lines and facilities as required (hereinafter called "stormwater <br />improvements**) per the Utility Plan referenced herein. <br />C.Underground lutural gas, electric, cable and telephone service to be arranged by <br />the Developer with the utility companies involved (hereiruifter called the "other <br />utility improvements"); <br />D. Landscaping and site rev^etation improvements per the approved Landscape <br />Plan lefimiKed herein (hereinafter call^ "landscaping improvements**). <br />E. TrafiSc control signage subject to approval by the City Engineer and Public <br />Services Director. <br />F. Any additional improvements listed within the Site ImfHovements Cost Estimate <br />attached hereto as Exhibit A (the "Estimate**). <br />7. CeMtniction of ImprovcHcnts <br />£fil It Date - Construction of Improvements shall begin no later than <br />r-’Developer Initial. <br />City Clerk Initial <br />-------tiJM
The URL can be used to link to this page
Your browser does not support the video tag.