My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2005 Council Packet
Orono
>
City Council
>
2005
>
10-10-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 12:30:30 PM
Creation date
1/12/2023 11:55:26 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MS-31 IS WJM Propcriici LLC <br />June 16,200S <br />i»e|c22 <br />In October 2003 the City Council adopted Resolution No. 5059 granting a CUP amendment to allow <br />the temporaiy use of fencing in place of final berming and landscaping along the north edge of the <br />parking lot, pending resolve of issues with MCWD regarding wetlands and site grading. <br />In November 2003 the City Council adopted Resolution No. 5084 granting CUP and Site Plan <br />Approval for a 20* x 75* addition along the south side of the existing detached 25* x 75* garage <br />structure located near the south end of the principal building on the property. This building addition <br />has never been constructed. <br />In November 2004 the City Council adopted Resolution No. 5250 granting approval for revisions to <br />die ^iproved lighting plan for the large easterly parking lot. The lighting has been completed. <br />Current Request <br />As noted in the applicants* letters of request, the current proposal is two-fold; <br />1. Tlie 20* X 75* detached garage addition was never constiaicted, and applicant has determined <br />that WJM*s current needs are for a slightly larger (50* x 100*) addition located at the west <br />end of the existing garage. This will be served by a driveway extending from the proposed <br />new parking lot to be located at the south end of the large main lot. <br />2. The proposed new 200* x 200* parking lot will be a southward extension of the existing main <br />parking lot lying east of the main building. This new lot takes the place of the 200* x 200’ <br />parking lot originally approved at the southwest comer of the building but never constmeted. <br />The area at the southwest comer might be used for a main building expansion in the future, <br />but that is not proposed at this time and is not part of this review. <br />The proposed building expansion is an allowed accessory use in the I (Industrial) District per Section <br />78-823. Section 78-825(b) requires that individual buildings in the I District hie no less than 5,000 <br />s.f. in area. The proposed building including the existing footprint plus additions will be 6,875 s.f. <br />Building height will be approximately 20* at the peak, meeting the 40* I District height limit. The <br />building will be setback more than 300* from all lot lines and approximately 130* from the main <br />building, meeting all required pertinent setbacks. The building addition will bring tliis 23-acre site to <br />approximately 27% structural coverage, far below the 45% limit for the I District. The building <br />addition is not visible from Highway 12 and should not require screening due to its relatively central <br />location within the site. <br />The exterior flnish of the building addition is proposed to be pre-finished metal comparable to the <br />existing accessory garage finish. Section 78-825(f)(2) requires that “All subsequent additic.is and <br />outbuildings constmeted after the erection of an original building shall be constmeted of materials <br />comparable to those used in the original constmetion and shall be designed in a manner confomiing <br />with the original architectural design and general appearance.** The principal building on the <br />property is of concrete/stucco/EFIS material rather tlian pre-finished metal. Planning Commission <br />should determine whether the proposed 5.000 s.f. addition (and perhaps the 1.875 s.f existing <br />building) should be finished to match tlie principal building.
The URL can be used to link to this page
Your browser does not support the video tag.