My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-22-2005 Council Packet
Orono
>
City Council
>
2005
>
08-22-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 11:25:44 AM
Creation date
1/12/2023 10:57:29 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L. <br />•04-2984 <br />February 17,2004 <br />Page 4 of 6 <br />Number of Parking Stalls. <br />Required s l per 200 f.f. of floor area <br />(Net = 36,000 s.f. -10% s 32,400 s.f. /200 = 162 stalls required) <br />Total stalls required = 162 <br />Total stalls proposed = 157 (5 are proof of parking) <br />To meet the 20’ required yard at Highway 12, mentioned above, the parking will be <br />reduced by 3 stalls. The applicant has stated that 3 proof of parking can be incorporated <br />into the revised plan. Staff finds that an additional 3 proof of parking stalls is acceptable <br />to achieve the 20* required parking yard. 5 proof of parking stalls are proposed in total <br />and 157 stalls will be constructed. Staff Hnds the 5 proof of parking stalls is acceptable <br />and these parking stalls would only be constructed if necessary to meet parking demands. <br />SurCMC Water Management <br />The applicant submitted a Grading, Drainage, Erosion Control and Utility Plan for review <br />by the City Engineer and is attached as Exhibit G. The applicant has supplied the City <br />Engineer with a drainage area map and storm sewer calculations. All storm water will be <br />directed, via pipe, to the storm water retention pond to the east. The City Engineer has <br />reviewed all plans as they relate the storm water and finds them to be acceptable. <br />Sanitary Sewer and Water Services <br />The applicant has provided the City Engineer with a profile view of the proposed sewer. <br />Hie site will connect to City sewer and water services from the existing stubs along <br />Kelley Parkway. The City Engineer has reviewed all plans as they relate the sanitary <br />sewer and water and finds them to be acceptable. <br />Road and Pedestrian Access <br />The property fronts on Kelley Parkway and Highway 12 and the site will be addressed off <br />Kelley Parkway. The lot is considered a through lot due to parallel frontages. In <br />determining setbacks, staff required both frontages to be considered front yards to ensure <br />adequate site lines from the roadway. The property will have 2 accesses off Kelley <br />Parlway. The most westerly is the shared access with the dental building and a new <br />access, aligned with the public works driveway. The City Engineer has reviewed these <br />access arrangements and finds them acceptable. The City has not received a copy of the <br />shared access agreement, which will be required prior to City Council review. <br />The applicant will be required to extend the existing 6 foot concrete sidewalk, from the <br />dental building to the west, to the eastern property line. This provides pedestrian access <br />from the existing trail along Old Crystal Bay Road, cast along Kelley Parkway. <br />Subsequent development of property east of the subject property will also be required to <br />extend the concrete walk to allow pedestrian access. <br />Signage <br />The subject property has 376 feet of road frontage on both Kelley Parkway and Highway <br />12 fw a total of 752 feet of frontage. Thus, the site is permitted one square foot per foot <br />of frontage, with each individual sign being limited to 100 square feet and setback 10 ’ <br />'"naiTiri <br />I <br />f ■ramr
The URL can be used to link to this page
Your browser does not support the video tag.