Laserfiche WebLink
MS-3fl2 <br />Juac 20.200S <br />Page I of 3 <br />Date AppHcatioa Received: 4-2(Mi5 <br />Date AppHcatioa Considered as Complete: 5-4-05 <br />60-Day Review Period Expires: 7-3-05 <br />To:Chair Rahn and Planning Commission Members <br />Ron Moorse, City Administrator <br />From: <br />Date: <br />Janice Gundlach, City Planner^ <br />JunelS.200S <br />Sabjcct:OS-3112, Lx)ren & Stacey Schoenzeit, 4480 Forest Lake Landing, <br />Lot Line Re-Arrangement, Rear/Street Yard Setback Variance, Hardcover <br />Variance, Public Hearing Continuation <br />Zoaiag Dtotrict: <br />Lot Area: <br />Lot Width: <br />LR- IB, One Family Lakeshore Residential District (Iacre min.) <br />0.33 acre (14,489 s.f.) <br />58’ @ shoreline; 45.5’ @ 75’ setback <br />ApptlcatloH Summary (revised request): Applicant requests the following in order to <br />construct additions onto the existing footprint and to remodel the existing residence; <br />1. Lot line re-arrangement with 1090 Wildhurst Trail whereby a land exchange would <br />result in two non-conforming area and width lots to remain non-conforming in area <br />and width. <br />2. Rear/Street yard setback variance to permit a setback of approximately 8’ when 30’ is <br />normally required and 8’ currently exists. <br />3. Hardcover.' variance to permit 60% hardcover within the 250’-500’ zone where 30% is <br />normally allowed and 54.9% currently exists (percentages based on post-lot line re- <br />_____arrangement zone areas). <br />Stqff Mecommeudattou: Staff recommends approval of the revised application pending the <br />following: <br />1. Submittal of a favorable engineering report regarding the existing foundation and its <br />ability to withstand the proposed improvements. <br />2. Dedication of a 20 ’ sewer easement centered over the existing sewer lines. This <br />easement should be dedicated by both owners (1090 Wildhurst Trail and 4480 Forest <br />Lake Landing). Staff is willing to negotiate the language of the easement to protect <br />existing encroachments and other potential interests. <br />3. Dedication of a 5’ drainage and utility easement, by both property owners, to exist on <br />each side of the reviscu common lot line. <br />The Planning Commission may want to consider whether a lake yard deck off the main level <br />of the home should be included, and also whether a secondary recommendation can be made <br />should the engineering report on the existing foundation be unfavorable. <br />Exhibits <br />Exhibit A — Notice of Planning Commission Action dated 5-17-05 <br />Exhibit B - Applicant Memo dated 6-10-05 <br />Exhibit C — Revised Hardcover Calculation Worksheets <br />Exhibit D - Revised Survey <br />Exhibit E - City Engineer Comments dated 5-26-05 <br />i