My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-2005 Council Packet
Orono
>
City Council
>
2005
>
04-11-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 4:43:49 PM
Creation date
1/11/2023 4:15:47 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
II / <br />minutes OF THE <br />OEONO CITY COUNCIL MEETING <br />Monday, March 14,2005 <br />7:00 o’clock p.m. <br />(005-3080 Interspace West, Contfaned) <br />Binett ststed die City csn require that whatever buildings are started are completed, but diat he is unsure <br />what interest the City has in requiring that all ten units be constructed. <br />Mrs. Carlson noted that die street and utilities wouldbeput inpriorto all the buildings being constructed. <br />Carlson commented they are anticipating this project would be completed within two to three years. <br />hb*. Carlson pointed out die lot would be landscaped as the buildings are being constructed. <br />Mnrphy moved, Mdtfillan seconded, to direct staff to draft an approval resolution for Application <br />M5-3080, Interspace West, 2060 Wayzata Boulevard West <br />Murphy requested Staff outline the steps in the approval process. <br />Oundlach staled Staff would prepa re an approval resolution containing all of the issues discussed tonight <br />and previously, which would come back tefore the Council at their next meeting. Gundlach indicated <br />following that the applicant would need to submit detailed plans addressing all issues raised and reappear <br />before the Planning Commission and City Council for General Development Plan approval. <br />Sansevere inquired whedier the motion includes some revision to the roofline. <br />Murphy stated Mrs. Carlson has indicated she would be willing to break up the rooflines. <br />Gaffron noted fliat issue would be included wifliin the resolution. <br />VOTE: Ayes 3, Nays 1, Sansevere opposed. <br />Sansevere noted he was opposed to the rpobon because he would like to see the revision to the roofline <br />prior to approving the concept plan. <br />9. #05-3081 ZB CONSTRUCTION, INC, 26XX KELLEY PARKWAY (OUTLOT E, <br />STONEBAY) - RPUD - FINAL DOCUMENTS REVIEW <br />Amie Zachman, ZB Construction, and Steve Johnston, Stonebay, were present. <br />Muifdiy indicated he has had an opportunity to visit this site and diat he is impressed widi the landscaping <br />in the back of this development. Murphy inquired how many buildings in die front are occupied or sold. <br />Johnston stated dwy have two models in the that have not been sold yet. <br />Gaffron stated at die last meeting the Council had directed Staff to draft approval documents and <br />resolution. The Council had requested additional screening or 'tedging to buffer the headlights from the <br />parking stalls, which die applicants have provided. Gaffron indicated in his view die plans are in , <br />compliance with the City Council’s requests. i t ' <br />PAGE 13 <br />< f Hi H ) i i <br />i. . . <br />i s <br />lit! <br />--------- -fc.
The URL can be used to link to this page
Your browser does not support the video tag.