My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-2005 Council Packet
Orono
>
City Council
>
2005
>
04-11-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 4:43:49 PM
Creation date
1/11/2023 4:15:47 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11. Addttioaal Coaditiou. <br />k <br />f <br />r <br />B. <br />c. <br />E. <br />F. <br />G. <br />H. <br />I. <br />/ •. <br />The development shall comply with the Landsc^ Plan per Sheet 12.1 dated 3/9/05 <br />prepared by Landform Engineering Co. The vegetative screening on the berm between <br />the building and the City of Qrono Public Works site consists of primari ly coniferous <br />qMcies wifli sraie dedduous trees intennixed. This screening is partially the responsibility <br />oftfwDevdoperandpartiallytheresponsibiiityoftheOwner. Developerand Owner shall <br />coordinate planting schedules to ensure the eariiest possible establishment of plantings in <br />this area, which is intoided to become a visual barrier to the Public Works site. These <br />plantings shall be completed by October 1,2005. All plantings shall occur within the <br />Property boundaries. Security fin* landsc^ing will be incorporated in the Letter of Credit <br />required herein. <br />Turning radiuses of fire apparatus access roads shall be designed subject to ^proval of <br />the City Engineer and Orono Fire Marshal. <br />Fire lanes will be marked with the rq^nopriate street signage and yellow curbing. Orono <br />Fire Mardud will deletmine fire lanes upon review of plans and final access routes and at <br />drat point determine exact placement of signs and yellow curbing. The sidewalk along the <br />easterly side of the building north ofCascade Lane shall be constructed with a sub-base <br />capableof supporting emergency vdiicles, subject to {qrproval by the Orono Fire Marshal. <br />Premises and unit identification will be reviewed by the City and established prior to <br />constructian. Anypermanentsite identification signage shall require priorCityspproval. <br />The lowest floor elevation of the building shall be no lower than 1020.00'. <br />Stoim sewer fiKilities which lie outsideofpidrlic right-of-way diall be privately owned and <br />maintained by the Developer, the Owner, or their successors. <br />All sanitary sewer and water connection lines within the Property shall be owned and <br />maintained by the Developer and Owner upon completion. <br />No site work or construction shall commence until the Developer has paid the Park <br />Dedication Fees, Storm Water and Drainage Trunk Fees, and Sewer and Water <br />Connection Fees established in Resolution No.____. TheMCES Sewer Availability <br />Charges(SAQ are the reqxmsibilityof the Developer and shall be paid to the City at the <br />time of building pomit issuance for transfer to MCES. <br />The Developer shall be responsible for the installation of street lights along the private <br />driveway and parking lot. TheDeveloperandCitystaffshallworktogethertopreparea <br />rite ligfitiog plan to be incorporated into the constructionplans. All exterior lighting shall be <br />downcast and riiidded. bteriorli^htinginthemainlobbyshallbederignedtonotpiovide <br />excessive light to the outside. <br />AP-6 <br />r <br />i <br />II
The URL can be used to link to this page
Your browser does not support the video tag.