Laserfiche WebLink
r-j. <br />?■. <br />i' <br />F:Floor plans for the building per the ’‘Concept Layout” prepared by Bruce Lehrer <br />Architects, (undated) which include 57 dwelling units and one guest unit, a single elevator <br />located near the midpoint of the building, and lower level parking for 95 vehicles. <br />G:Building exterior elevations and materials per Sheet A-2 prepared by Bruce Lehrer <br />Architects last dated 1/21/05, subject to submittal of facade elevations for all sides of the <br />buildingtobesimilar in variety and percentage mix ofmaterials to the facades shown on <br />said Sheet Buildingmatbiials required by this approval areas indicated on said Sheet A-2 <br />and shall include architectural shingles plus both a light and dark stone mixture on the <br />fecades as shown by tfie shading on the plans. Roof lines and variety of roof heights, etc. <br />shall be as shown on said Sheet A-2. <br />The above plans are subject to any additional requirements of the Miimehaha Creek Watershed <br />District and subject to any additional requirements and conditions specified by the City Engineer <br />uponreviewoffinal|dans. ConsIniciionoftheoondominiumbuildingduillbeinconfoimaiKewith <br />the building codes and regulations adqrted by the City of Qrono. Any substantial changes to the <br />gross square firotage^ fix)tprint/wal]/roof dimensions or defined building hei^t shall require a prior <br />ammdment to this Agreement. <br />Inqiroveaicnts. In accordance with the policies and ordinances of the City of Orono, the <br />foUowirrg described pdMic or private improvements (hereinafler collectively called “Inyrovements*') <br />shall be constructed, installed, paid for and maintained by the Developer according to the terms <br />and cemditions contained in this PUD Agreement: <br />A.Site grading, dtivewqfB, curb and gutter, parking lots, sidewalks, retaining walls if requited <br />and all necessary erosion control measures per the Grading, Drainage & Erosion Control <br />Plan referenced herein (hereinafter called "site grading improvements”); <br />B.Constnictionofsanitary sewer and water connections, and construction ofstorm sewer <br />lines and fidlities as requited (hereinafler called‘Istonnwater improvements”) per dre-Ulility <br />Plan referenced herein. <br />C.Underground natural gas, electric, cable and telephone service to be arranged by the <br />Develops with the utility companies involved (hereinafter called the "other utility <br />improvements"): <br />Landscaping and site revegetation improvements per the approved Landsciq>ing Plan <br />refierenced herein (hereinafter called “landscaping improvements”). <br />E. Traffic control signage subject to approval by the City Engineer and Public Services <br />7Ilf <br />Director. <br />AP-3