Laserfiche WebLink
City of Orono <br />Stonebay Lofts <br />Plat No. 05-3081 <br />Site Improvemont Cost Estirrate <br />Item Unit <br />Mobilization <br />Sito Grading <br />Concrete Curb and Gutter <br />Bituminous Pavement <br />Concrete Sidewalk <br />6" DIP, Cl. 52 <br />8“ PVC Watermain <br />6" Gale Valve and Box <br />0" Gate Valve and E »x <br />Hydrant <br />Connect to Existing Watermain <br />12" RCP <br />15"RCP <br />Catch Basin <br />Catch Basin Manhole <br />Connect to Existing Catch Basin Manhole <br />6" PVC. SDR 35 Sanitary <br />Connect to Existing Sanitai y Sower <br />Rock Retaining Wail <br />Sod with Topsoil and Fertilizer <br />Restoration including trees <br />Silt Fence <br />Est <br />Quantity <br />Unit <br />Price <br />Est. <br />Cost <br />LS <br />LS <br />LF <br />SY <br />GF <br />LF <br />LF <br />EA <br />EA <br />EA <br />EA <br />LF <br />LF <br />EA <br />EA <br />EA <br />LF <br />EA <br />SF <br />SY <br />IS <br />LF <br />1 <br />1 <br />785 <br />1,110 <br />1,660 <br />25 <br />110 <br />2 <br />1 <br />2 <br />1 <br />43 <br />115 <br />1 <br />3 <br />1 <br />60 <br />1 <br />335 <br />2,400 <br />1 <br />800 <br />$5,000 <br />30,000 <br />10 <br />22 <br />3 <br />22 <br />22 <br />600 <br />800 <br />1,500 <br />1.000 <br />25 <br />30 <br />1,200 <br />1,500 <br />500 <br />27 <br />1,000 <br />30 <br />3 <br />39,530 <br />3 <br />$5,000 <br />30,000 <br />7,850 <br />24,420 <br />4,980 <br />550 <br />2,420 <br />1,200 <br />800 <br />3.000 <br />1.000 <br />1,075 <br />3,450 <br />1,200 <br />4.500 <br />500 <br />1.350 <br />1.000 <br />10.050 <br />7,200 <br />39.530 <br />2,400 <br />Estimated Construction Cost <br />+50% Security Deposit <br />Total Security Deposit Required <br />$153,475 <br />$76,738 <br />$230,213 <br />City of Orono <br />Stonobay Lofts <br />Plat No. 05-3081 <br />OH Sito Improvement Cost Estimate (Street to Turn Around) <br />Horn <br />Est. <br />Unit___Quantity <br />Unit <br />Price <br />Est. <br />Cost <br />Mobilization <br />Conaoto Curb and Gutter <br />Bituminous Pavemeiil <br />Silt Fence <br />LS <br />LF <br />SY <br />LF <br />1 <br />315 <br />450 <br />100 <br />$1,000 <br />10 <br />22 <br />3 <br />$1,000 <br />3.150 <br />9,900 <br />300 <br />Estimated Construction Cost <br />♦ 50% Security Deposit <br />Total Security Deposit Required <br />$14,350 <br />$7,175 <br />$21,525