Laserfiche WebLink
r <br />K. 'Flic Dcvdo|)crshall be rcs|X)nsiblcforobtainingthcneccssjuyjxjnnifs from the regulatory <br />agencies such as the Minnesota Department of Health, MCBS, Watershed District, <br />Minnesota DNR, Mi»CA and MnDOT. <br />L Tlie Developer shall report to the Ci'y lingineer the location ofanydrain tiles found during <br />constructioti. The Developer will comply with the City Engineer's direction as far as <br />abandonment or relocation of the drain tile. <br />M. The Developer shall develop a sediment and erosion control plan and shall obtain the <br />necessary permits from the Minnehaha Creek Watershed District prior to commencing <br />construction. Erosion control fencing will be required around the wetlands. Wood fiber <br />blankets shall be utili/.cd on all slopes in excess of 3:1. <br />N. The Developer .shall develop a sediment and erosion control plan and shall obtain the <br />ncces.saryNI’DES Pluuse II Construction Site permit prior to commencing con.struction. <br />Erosion control fencing will be requiied around the wetlands Wood liber blankets shall <br />be utilized on all slopes in excess ol 3:1. <br />O. If material is imported or exported from the site, the De\ eloper shall provide the City <br />with a detailed haul route for review and approval. If the material is to he imported or <br />exported to/from another site in Oroiu), it should be noted that those other parcels wili be <br />required to obtain a land alteration pennit, and potcniially a (xmditional Use Permit, from <br />the City. <br />P. Developer .shall obtain a ('onstniction Ea.sement from Owner for constniclionofCascdae <br />I>ane and associated utilities within Outlet Ci, S TONEHAY. <br />Q. Quality Assurance. Hie developer sliall cooperate w-*’ the City’s Huililing ai id Zoning staff <br />to ensure quality workmanship and materials arc used in the construction of the building. <br />Prior to commencement of construction, thef’ity’s Building and Zoning staf (and the <br />Developer will tievelop a .set ofslandards regarding the level ofqualily ofworkman.ship and <br />materials, 'riie.se .stiuidards will be ha.sed on industry standards, manuf acturers installation <br />instnictions, and other relevant criteria. Issues lelateif to quality of workman.vlup aiuEor <br />materials, which arise during construction, will be addres.sed based on these quality <br />standards. Ifthe is^ueis not cicarlyaddresscd by the quality standards, it .shall be resolved <br />through a Quality Ass .ranee Committee, with representatives from the City and the <br />Developer. <br />12. Cciicnil Conditiuiis. 'I'he general conditions of this Contract, approvetl by the City Council on <br />______200.S arc attached as Exhibit "A" and incorporated herein. <br />if AP-7