Laserfiche WebLink
r <br />11. Additional Conditions. <br />A. The development shall comply with the Landscape Plan per Sheet L2.1 dated 3/9/05 <br />prcparctl by Liindfomi, Inc. The vegetative screening on the berm between the building <br />and the City of Orono Public Works site consists of primarily coni ferous species with some <br />deciduous tr--cs intennixed. This screening is partially the responsibility of the Developer <br />and partially the responsibility of the Owner. Developer and Owner shall coordinate <br />planting schedules to ensure the earliest possible establishment of plantings in this area, <br />which is intended to become a visual barrier to the Public Works site. Tlicse plantings shall <br />be completed by October 1, 2005. All plantings shall occur within the Property <br />boundaries. Security for landscaping will be incorporatal in the IxttcrofCrcdil required <br />herein. <br />B. Turning radiuses of fire apparatus access roads shall be designed subject to approval of <br />the City liiiginecr and Fire Marshal. <br />C. Fire lanes will be marked with the appropriate street .signage and yellow curbing. Fire <br />Maiahal will detennine fire lanes upon review of plans aiui final access routes and at that <br />point determine exact placement of signs and yellow curbing. <br />D. Premises and unit identi fication will be reviewed by the City and established prior to <br />constnict ion. Any pennanent site identi fication signage shall require prior City approval. <br />E. The lowest floor elevation of the building shall be no lower than 1020.00'. <br />F. <br />G. <br />II. <br />J, <br />S‘onn sewer fad lities which lie outside of public riglU-of-way shall be privately owned and <br />maintained by the Developer, the Owner, or their successors. <br />All sanitary sewer and water ccnncction lines within the Property shall be owned and <br />maintained by the Developer and Owner upon completion. <br />No site Work or construction shall commence until the Developer has paid the Park <br />Dedication Fees. Stomi Water and Drainage Trunk Fees, and Sewer and Water <br />Connection I'ees as established in Re.solution No._____. The MCES Sewer Availability <br />Charges (SAC) arc the responsibility of the Dcvelojxrr and shall l>e paiil to the City at the <br />time of building pennit issuance for tiansfer to MCES. <br />The Developer shall be responsible for the installation of street lights along the private <br />driveway and parking lot. 'I he Develojicr and City staff shall work together to prepare a <br />lighting plan to be incorporated ir.lo the construction plans. <br />The Developer shallprovideacopyofthccoveniuits for review and approval by theCity. <br />aiui said covenants shall be filed at tlie County witli tl. inal plat documents. <br />AF-6 <br />I