Laserfiche WebLink
SchoelE &. Madson, Inc <br />Engineering • Surveying • Planning <br />Soil Testing • Environmental Services <br />WWW snhoeilmndson . com <br />January 20,2005 <br />Mr. Tom Kellogg <br />Uoncstioo, Koscnc, Anclcrlik & Associates <br />2335 West Highway 36 <br />St. Paul, MN 55113 <br />Subject:Response to Comments Hated January 13, 2005 <br />Creckside in Orono, SMI Job No. 64096-001 <br />Hear Mr. Kellogg: <br />Following arc the re.sponscs to the comments given in the January 13, 2005 staff report: <br />1.The gcoteclinical repoil is included. The pavement .section is from the Orono <br />Standard Details, City Plate No. STR-5. After di.scussions with the City Council the <br />trail location is unchanged. The trail has been revised to be a natural base trail where <br />erosion may occur. <br />2.The grading plan has been revised to show grading in all of the lots. We discussed <br />with Mike (lalfron the grading of the westerly portions of I.ots 1 and 2 to drain <br />southerly to the creek. He does nut want to mass grade this area but would rather <br />grade the area to provide drainage to the creek with niininial disturbance. A note iias <br />been added to the grading plan. <br />3. 'I'hc following arc the rcsponse.s to the comments from Lance Hoff: <br />1.The additional runoff has been added as recommended to the storm sewer and <br />pond design and the storm .sewer and ponds have been revised. <br />2. 'I'lic HOF elevation of 950.4 from the road has been added to the plans. <br />3.The !•( )F from the road has been offset from the storm sewer <br />4.The HOF' elevation of 941.2 from the pond to the wetland has been added to the <br />plans. <br />5.riic pond and infiltration berms have been raised to be 1 ’ above the lOO-yr <br />.stonn. The pond berm has been lai.sed to an elevation of 942 2 and the <br />inriltration berm has been niiseil to 939.3 <br />AffirmatiM Aotion Equal Opportunity Employor <br />irViflri Wiwntjx Ftniilnviirrl Ruito 1 • Minno.'ioolin MN fifinnS-l fiPfi