My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-24-2005 Council Packet
Orono
>
City Council
>
2005
>
01-24-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 10:39:08 AM
Creation date
1/11/2023 10:24:08 AM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
laserfiche2
Created:
1/11/2023 10:39 AM
Modified:
1/11/2023 10:39 AM
Text:
http://www.eonealPDo.cont
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Jan 13 SOOS 10:03 BOMESTRQO ROSENE RNDERLIK 6516361311 P.‘t <br />Memo <br />Pi'ojoct Name: Creekside in Orono <br />To: Mike Gaffron, Tom Kellogg <br />i^Bofiesiroo <br />SM noMrur <br />Asfocidtef <br />ximnai <br />Client: The City of Oiono <br />File Mo: 139-04-000 <br />From: Lance Hoff Data: 1-12-05 <br />Re: Drainage Review <br />fff.aiBa <br />Development: Creekside in Orono <br />Doveloper: Creekside in Orono, LLC <br />Engineer: Schoell and Madson, MPLS <br />Submittal: Plans, Response to Comments <br />Plan Sheets; Grading and Drainage, Erosion Control, Standard Details, Utilities, SWPPP <br />Date of Plans: 12-03-04, latest revision on 1-03-05 <br />Date Received: 1-11-05 <br />Summary of Recommendationa <br />Based on our review of the Creeksido In Orono development, we offer the following comments. Details on each <br />recommendation are included in the following section of this memo. For ease of reference, the numbers of the <br />recommendations listed below match the numbers of their detailed explanations, listed In the following section. <br />1. All off-site drainage should be included in the drainage calculations. <br />2. The EOF from the road should bo dosignod to meet freeboard roquiremonts and clearly labeled on <br />the plans. <br />3. The EOF from the road should be designed to avoid paralleling the storm sewer as much as <br />feasible. <br />4. An EOF should be provided from the pond to the wetland. <br />5. The pond and infiltration basin berms should be raised to contain tho 100-yr storm. <br />SoftMlroo, Rommnm, Andtrtlk and Aaaoclataa, tnc. <br />OSLMutOmBa: <br />21M Wmi >«ghw«y M <br />SI. Paul. MN sails <br />Pinna: Bai.a3a-4aoo <br />i-u eai4M 1311 <br />a MNwauliM Offle«: <br />1816 Wo»t MM)uon RomI <br />M»quon. Wt &3062 <br />Phona 262-241-4406 <br />l-M. 202 241-4901 <br />□ RoQhMttr Offica: <br />112 7*5lfMtNE <br />RochMltf. MN 65906 <br />507-20? 2100 <br />r»i. S07-282 3100 <br />U WiiifviAr Offica: <br />208 501 8Um1 8W <br />Wilrnar. MN 5020^ <br />Phons 320-214-9657 <br />f mu: 32O-214-O450 <br />www.eonealPDo.cont <br />U 8t Cluud Oino«: <br />3721 23** Btrw9t G <br />SI Oovd. MN 66301 <br />PhOTHi 320 251 4553 <br />fmiL 320-251-6252 <br />oarmymmkmorno^: <br />666 8#Nal f Road <br />CkvyalMcs. it 00030 <br />Phona 047-546-6774 <br />Fm S47-S46-6079
The URL can be used to link to this page
Your browser does not support the video tag.