My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-18-1991 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1991
>
03-18-1991 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 2:34:43 PM
Creation date
12/14/2022 2:13:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning File #1457 <br />March 14, 1991 <br />Page 2 of 8 <br />List of Exhibits for A fc B <br />Exhibit A <br />Exhibit B <br />Exhibit C <br />Exhibit D <br />Exhibit E <br />Exhibit F <br />Exhibit G <br />Exhibit H <br />Exhibit I <br />Exhibit J <br />Exhibit K <br />Exhibit L <br />Resolution #2764 - Preliminary Plat Approval 3/12/90 <br />Carlson Letter 2/11/91 <br />Cook Report 3/11/91 <br />Gaffron Report 3/13/91 <br />Application #1630-Conditional Use Permit/Variance <br />Property Owners List <br />Bike Trail Plan <br />Bike Path Section <br />Revised Preliminary Plat <br />Grading Plan <br />Road Profile/Typical Section/Elevation Monuments <br />Location Map <br />Revised Grading Plan <br />Staff Sketch as of Future Connecting Roads <br />Drainage Alternative Sketches <br />A. Review of Revised Preliminary Plan <br />Staff has informally discussed with the Planning Commission the <br />circumstances surrounding the Corps of Engineers denial of Mr. <br />Carlson'o request to fill and grade within the Type 6/7 wetlands <br />within the northern portions of the property. Please review Exhibit <br />E, Mr. Carlson's letter that reviews the background and circumstances <br />of that denial in detail. A public hearing has been scheduled for <br />tonight's meeting to review the revised 12-lot plat. <br />Review of Revised Plat <br />Lot Configuration <br />The lower 8 lots remain at approximately the same configuration <br />as the origianl. It is the most northern 4 residential lots that have <br />been altered with the revised plan. Lot 5, Block 1 has been trimmed <br />back to a total of 3.4 acres from 6.8 acres retaining the 2 acres dry <br />contiguous. Proposed Lot 5, Block 3 has been realigned because of the <br />realigned roadway. The lot is shown retaining 2 acres dry contiguous. <br />As already noted above. Lot 1, Block 2 as shown will require a <br />variance to the minimum 2 acre area standard because of the exclusion <br />of the private driveway easement area. The lot line can be <br />readjusted between 1 and 2 to provide the additional 3,000 s.f. of dry <br />buildable area for Lot 1. Once again, the bike trails propos <br />“ _ A m ^ « <br />proposed with <br />the second phase of this review will also create dry buildable area <br />problems for Lot 1. Applicant should also advise how bike trail is <br />going to work with placement of private drive along southern edge of <br />Lot 1, Block 2. <br />1 <br />I I lAA tr a. ff f%t b t't*a l r r f e W rr- k ilk' f « a f' « Lt I I f fn^iirai ii J m ■
The URL can be used to link to this page
Your browser does not support the video tag.