My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-18-1991 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1991
>
03-18-1991 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 2:34:43 PM
Creation date
12/14/2022 2:13:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /><■ • <br />' i'. <br />Crystal Creek Subdivision <br />March 13, 1991 <br />Page 3 of 3 <br />- Version #9 (3/12/91) <br />General Comments, Re: Septic Systems - <br />Each proposed lot contains approved primary and alternate <br />drainfield sites. All sites require mound systems due to soil <br />conditions. <br />Because road construction and swale construction will allow <br />grading traffic over a wide ranging area of this property, and <br />because in many cases thv two drainfield sites shown are the only <br />available sites for a given lot, it is critical that those sites <br />be protected during road and swale/berm construction. Where <br />drainfield sites are relatively near actual grading areas, <br />fencing should surround those sites. Where sites are remote from <br />any anticipated construction activity, minimal fencing (i.e. <br />posts and rope) may suffice. These protected measures should <br />remain until all grading work on the property is complete. <br />In addition to the documentation needed for the relocated <br />drainfield sites on Lot 2, Block 2 and Lot 5, Block 3, a review <br />of the septic information submitted by S-P Testing and a review <br />of versions #1-8 of the site and grading plans reveals that <br />although percolation/boring hole locations have been shown, they <br />have not been numbered so it is impossible to known which hole is <br />which on each lot. This information is necessary and should be <br />provided by S-P Testing or shown on a copy of the plat drawings.
The URL can be used to link to this page
Your browser does not support the video tag.