My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-1991 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1991
>
11-18-1991 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 2:04:50 PM
Creation date
12/14/2022 1:53:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning File #1691 & #1702 <br />November 15, 1991 <br />Page 5 <br />of the lagoon. Drainage from the retention area adjacent to <br />railroad currently flows at approximately the 960 elevation to <br />the east (the wetland system within the Orono Oaks plat). It is <br />the intention of the applicant to redirect surface run-off from <br />this pond to the lagoon. Applicant's final grading and drainage <br />plan shall provide detail on how drainage shall be conveyed from <br />retention pond to lagoon. The grading plan shows the elevation <br />of first habitable floor of each pad - not all elevations meet <br />required elevation (948.3 or 1 foot above flood plain elevation). <br />Elevation must be at least a foot above the 947.3' elevation at <br />948.3* or greater. <br />Options of Action <br />Denial. If PRD/Preliminary Subdivision application is to be <br />denied, please refer to the pertinent sections of the zoning code <br />referenced above and to the rural goals and policies set forth in <br />the CMP. Refer to Exhibit H-1-6. <br />Approval. If approved, the following conditions <br />recommended by the staff: <br />1. Final grading and drainage plans to include: <br />are <br />a. <br />b. <br />c. <br />d. <br />6 • <br />Detail on entrance road section. <br />Drainage plan for retention pond within Pads 11 <br />and 12 and detail on outlet to lagoon. <br />Placement of relocated section of force main. <br />All amendments or additions to plan requested by <br />MCWD. <br />Final road elevation must be no more than 2* below <br />the flood plain elevation at 947.3'. <br />2.Declaration of Covenants to include the following; <br />a. Building pads approved for each of the 13 pads to <br />include such information as setbacks, elevation of <br />first habitable floor, approved drainage pattern. <br />City of Long Lake or future developer to obtain <br />necessary permit approvals from the Corps of <br />Engineers and DNR as expanded construction roadbed <br />will encroach the DNR protected wetlands. <br />b. <br />3.Appropriate public easements to be taken over all <br />utilities and drainageways not included within public <br />road right-of-ways. Final plat should show road names <br />rather than outlets if these roads are to be public. <br />4.Final plat to designate lagoon/pond as an outlet. <br />Drainage easements are to be shown over the entire pond <br />defined as a DNR protected wetland with specific <br />numerical designation. All wetland areas or additional <br />retention areas are to be designated with drainage <br />easements. <br />hiti.
The URL can be used to link to this page
Your browser does not support the video tag.