My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-21-1991 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1991
>
10-21-1991 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 2:08:46 PM
Creation date
12/14/2022 1:51:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning File #1691 <br />October 17r 1991 <br />Page 4 <br />It may be your first inclination to assume that you will <br />recommend denial but we hope before motions to deny are raised we <br />ask that you delay any form.al action until all information is <br />presented by the applicant. David Squire, the planner for the <br />project and an associate of McCombs Frank Roos Associates, the <br />Orono staff and consultants have all worked very closely together <br />this past month to prepare the preliminary submittals. <br />Additional information has been called for by the various <br />reviewing agencies and has yet to be submitted by applicant. <br />(The delay for applicant's planner has been the inability to <br />arrange for the necessary site inspections by these agencies <br />within a reasonable time frame.) <br />It has been the goal of both Mr. Squire and staff to provide <br />the best possible subdivision application given conflict between <br />the directives of our current code and the need to obtain 13 lots <br />via a conventional plat. We look for your assistance, not your <br />criticism. The subdivision will be presented to the Council we <br />hope with the Planning Commission's input. <br />B. Rezoning <br />w <br />If we were to achieve a 13 lot plat of the 24 acre property <br />via a conventional plat, the plat had to be rezoned to 1 acre. <br />All of the formal agreements dealing with the annexation failed <br />to provide directions as to how the 13 units were to be <br />implemented -— but it was to be accomplished per Orono Codes. At <br />first it was thought through a Planned Residential Development <br />similar to a Sugar Woods but the agreements did discuss lots and <br />the applicant has pursued and filed for a conventional 13 lot <br />plat. All R-IA standards will be applicable as already stated <br />above. In reviewing Exhibit P, the 1 acre per unit appears to be <br />a good buffer between the 2 acre densities within Orono and the <br />surrounding LL densities of 2 units per acre. The R-IA standards <br />are as follows: <br />1. <br />2. <br />1 acre in area as property is sewered. <br />Conservation areas (wetlands/flood plain) may intersect <br />the lot but each lot must have a minimum 1/2 acre dry <br />contiguous building pad. <br />3.35' setback for front and rear and 10' setbacks to the <br />side. 26' setback from all wetland areas and the <br />Ordinary High Water Mark of the creek (determined at <br />the top of the bank). The DNR is currently determining <br />the Ordinary High Water Mark of the lagoon or former <br />sewer pond and a 26' setback must be maintained from <br />the Ordinary High Water Mark of the lagoon. Specific <br />lot configuration issues shall be reviewed under the <br />preliminary subdivision comment section. <br />I !■ irn ‘ f nr r in^i ~i i nfcrili^ifli
The URL can be used to link to this page
Your browser does not support the video tag.