My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-1991 Planning Packet
Orono
>
Planning Commission
>
1991
>
06-17-1991 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 1:00:01 PM
Creation date
12/14/2022 12:45:12 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of OnOINO <br />RESOLUTION OF THE CITY COUNCl L <br />caw NO.139 <br />.n RESOLUTIO'T A?PROVi:iG THE <br />CAR:-!A:; bay heights <br />T OF <br />ri <br />WHEREAS, the City of Orono is a municipal corporation organizea <br />and existing under the laws of the State of Minnesota; and <br />of land within the City; ant <br />WHEREAS, the City Council has considered the application for <br />a subdivision plat by Michael G. Pluhm and William Z. Merni.v, the <br />subdividers; and <br />WHEREAS, the subdividers have completed ail requirements of <br />the platting regulations oi the City, inducing; <br />1) Dedication on the plat of drainage and utility easements. <br />2) Dedication on the plat of utility easements for Municipal <br />sewer and water lines that interest the subject property. <br />Dedication to the City of 4 drainage easement providing <br />for limitations on f.y wetlands and/or drainageways <br />described therein and •-5. /U the plat as drainage <br />easements'*. <br />4> The execution of an ooen space easement limiting the total <br />' square footage of hardcover for Lot 1, Carman Bay Heighcs, <br />to 33,000 square feet, such hardcover shall conrorm to <br />all applicable ordinances of the city of Orono. <br />5) Payment to the City of $75.00 for legal fees for reviewing <br />and recording the final subdivision and all documents <br />related thereto. <br />6) Execution of a Subdivider's Agreement providing for <br />installation of the following improvements; <br />a) New driveway connection for Lot 1, Carman Bay Heights <br />at Kelly Avenue to be completed and existing connection <br />at Walters Port Lane removed, not later than January 1,^ <br />1984. Upon completion of new driveway connection Lot I's <br />address shall be changed from Walters Pott Lane to Kelly <br />Avenue with adequate identification provided at Kelly Avenue <br />for both residences on Lots 1 and 2. Existing driveway <br />"ramp” and connection to Walters Port Lane to be removed, <br />fegraded and landscaped within 30 days after completion <br />of new driveway connection. <br />b) Water stub to serve existing house on Lot 2 oust <br />be extended to the lot line of Lot 2 by November 1, <br />1 Ofl? . <br />I.
The URL can be used to link to this page
Your browser does not support the video tag.