My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-1991 Planning Packet
Orono
>
Planning Commission
>
1991
>
01-22-1991 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 12:22:47 PM
Creation date
12/14/2022 12:02:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■r- <br />Zoning File #1600 <br />January 17, 1991 <br />Page 2 <br />Please review Exhibit U. The City Engineer recommends <br />moving existing access on County Road 15 to a Kelly Avenue <br />access and moving the current access at County Road 19 to the <br />sourthern property line. Applicant may be able to gain <br />additional parking stalls with the realignment of accesses. <br />Topography at the south lot line may restrict moving access to <br />southern ]ot line. This is an issue that would be best resolved <br />by City Engineer and staff working with applicant. <br />Drainage <br />The City Engineer's report reflects the opinion of the City <br />staff. The storm sewer problems of Kelly Avenue cannot be solved <br />by this property owner only. Storm sewer problems may best be <br />addressed with a comprehensive study at the time of redevelopment <br />proposals for Navarre. There is no doubt that this property is a <br />major contributor to the surface run-off but at the same time <br />this property will also be assessed for this project based on the <br />amounts of surface run-off that originates from this site and <br />enter the watershed. Cook confirms that the retention pond will <br />treat all run-off that results from the proposed addition. The <br />City Engineer was asked if making the pond deeper would allow for <br />greater retention. In this case Cook responded that by deepening <br />the pond you would encourage standing water and in cases of <br />storms, this standing water would already occupy the lower <br />retention area providing no additional retention capabilities on <br />site. Ron Quanbeck of the MCWD has confirmed that run-off from <br />the addition will be handled by the proposed retention pond. <br />There is no structural damage with the seasonal flooding that <br />takes place within the spring and fall of the year. The storm <br />sewer issue is one matter that will be addressed in either a <br />redevelopment project for this area or by an independent storm <br />sewer project. <br />Issues to be Resolved by Applicant <br />Per directives of the Planning Commission, please review <br />Exhibit C, the applicant has prepared position papers responding <br />to concerns of the Commission covering excessive side street <br />setback variance sought at west property line, impact of the <br />retaining wall along west property line, elevations of structure, <br />relocation of internal improvements, relocation of receiving dock <br />and compactor. <br />The applicant has submitted cement elevations of the <br />addition as it relates to the existing structure. Review Exhibit <br />AA), the retaining wall is shown at a maximum height of 17' from <br />final grade. Staff does not understand the import of the <br />relocating of the ramp at the receiving dock. Applicant should <br />be asked to respond. Applicant's contention is that the wall <br />will not only provide a visual buffer to the residence to the <br />immediate southwest but also a noise barrier.
The URL can be used to link to this page
Your browser does not support the video tag.