Laserfiche WebLink
25Appendix IV: Summit Beach Park Master Plan Cost Estimate <br />November 3, 2022 <br />Item Item Description Unit Est. Qty Notes Unit Cost Total Cost <br />1 Buoyed Swimming Area LS 1 additional yearly maintenance cost $4,000 $4,000 <br />2 Swimming Platform LS 1 additional yearly maintenance cost $10,000 $10,000 <br />3 Winter Skating Rink & Trail Plowing LS 1 this amenity cost will vary year-to-year $5,000 $5,000 <br />4 Canoe/Kayak Rack LS 1 $7,000 $7,000 <br />5 Limestone Slab Seating EA 6 match existing limestone from East Long Lake trail $2,000 $12,000 <br />6 Tree Replacement/Landscape Plan LS 1 does not include plant material costs $3,000 $3,000 <br />7 Picnic Table LF 3 match existing tables from Big Island shelter $6,000 $18,000 <br />8 Restroom / Warming House / Small Public Building LF 1 additional yearly maintenance cost $300,000 $300,000 <br />9 Bituminous Parking Lot LF 1 paving and curb & gutter for 1/2 of the existing lot $70,000 $70,000 <br />10 Rain Garden LF 1 includes grading, soil, mulch and plant material $4,000 $4,000 <br />11 Interpretive Signage LF 3 $3,000 $9,000 <br />12 Bike Rack EA 3 match existing city standard $1,800 $5,400 <br /> Subtotal $447,400 <br />Contingency (15%)$67,110 <br />Preliminary Total $514,510 <br />Summit Beach Park Master Plan Improvements <br /> <br />PRELIMINARY ESTIMATED COSTS