My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-2022 Council Packet
Orono
>
City Council
>
2022
>
11-14-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2022 1:53:11 PM
Creation date
12/8/2022 1:47:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Orono, Minnesota <br />Executive Summary <br />November 2022 <br />SUMMIT BEACH MASTER PLAN <br />Process <br />In May 2022, the City of Orono enlisted the services of Bolton & Menk to help guide the City through a formal master <br />planning process of Summit Beach Park. The master planning process was a coordinated effort between the Park Board <br />Steering Committee, City Staff and the general public through meetings, open houses and surveys. In early June a site <br />analysis and online survey were developed to aid in the process. A second online survey was created in August to help <br />gather input on proposed amenities and their preferred scale. Three open houses were also conducted as part of the <br />project. The August and September open houses were held at Summit Beach Park while the third open house was held <br />in the Orono Council Chambers in October. Although the open houses were lightly attended, the feedback from the online <br />survey was strong. 277 people provided input with survey #1 and 205 people participated in survey #2. <br />Complete survey results and Open House meeting minutes can be found in the Appendix. <br />Existing features: <br />Summit Beach Park contains 4.8 acres of beach front property along the southeastern edge of Long Lake. The property <br />was donated to the City of Orono by Bruce and Ruth Dayton. The main existing features include the following: <br />Overview <br />• Beach/ swimming area <br />• Canoe storage <br />• Picnic tables <br />• Chemical toilet <br />• Open space <br />• Hilltop with mature trees & <br />picnic area <br />• Steep wooded slopes <br />• Wetland area <br />Input Gathering / <br />Outreach & <br />Visioning <br />Master Plan <br />Development <br />Master Plan & <br />Formal Review <br />May June July August September October November <br />Project <br />Approval <br />Initial Online <br />Survey Live <br />Steering <br />Committee <br />Kick-Off Meeting <br />#1 (18th) <br />Steering <br />Committee <br />Meeting #2 <br />(28th) <br />Steering <br />Committee <br />Meeting #3 <br />(21st) <br />Open <br />House <br />#2 (17th) <br />Open <br />House #3 <br />(13th) <br />Parks Commission <br />Draft Master Plan <br />Review (3rd) <br />City Council <br />Action (14th) <br />Open <br />House <br />#1 (13th) <br />Parks Commision <br />Master Plan <br />Action (7th)
The URL can be used to link to this page
Your browser does not support the video tag.