My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-1983 Planning Packet
Orono
>
Planning Commission
>
1983
>
08-15-1983 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2023 2:39:03 PM
Creation date
12/7/2022 3:49:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'A <br />plat but the <br />/ the City; <br />i. If Planning <br />applicant's <br />of road right of <br />bructure as lot <br />^n met. <br />ary approval, the <br />. finding all <br />ri-site septic <br />c the Countryside <br />ng conditions: <br />B exclusive of >: <br />if septic test <br />tic system. <br />nstruction <br />4 <br />' -m <br />> 1 <br />Th <br />*-y' '' • <br />fev. <br />•- <br />...4 <br />FROM: <br />Richard Conry <br />Jeanne A. Mabusth <br />DATE:June 30, 1982 <br />SUBJECT:#654 DiCon, 155 Willow Drive North - Preliminary Subdivisi <br />Conditions of Approval and submittals required for Fi <br />Plat Approval <br />Conditions of Approval <br />1 - <br />plats dated, revised June 22, 1982. <br />2 -Outlot A is not platted as part of this <br />s*'«;«.or.. <br />such development must meet all zoning and Comprehensive <br />Plan requirements at that time* <br />3 -iisifsfi=?si mfi <br />the time the building permit is applied for based on lot line <br />changes made after original septic testing. <br />4 - <br />subject road during the interim period. ^ to be <br />constructed per plans dated, revised May 10, 1982. <br />5 -Prior to final plat approval, the developer . <br />regrading, filling, construction of water control device and <br />retention pond per plans dated, revised May 10, 1982. <br />Improvements Required <br />Prior to any improvements being made on the site, the City Engineer <br />has asked for the following changed and additional information; <br />Changes are as follows; <br />1 -Street section to be 30* wide gravel base 8" thick shoulder <br />P.I. to shoulder P.I. with a 24* wide bituminous surface two <br />inches thick. <br />y <br />a <br />I <br />.■■Tv <br />i--; 'f. <br />TO; <br />FRO <br />DAT <br />SUB <br />LIS <br />Exh <br />Exh <br />Exh <br />Exh <br />Exh <br />Exh <br />Rev <br />Com <br />pos <br />rep <br />was <br />up <br />rem <br />gra <br />The <br />rec <br />pro <br />str <br />own' <br />was <br />Rev <br />Are <br />All <br />Exi <br />Pro
The URL can be used to link to this page
Your browser does not support the video tag.