My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-16-1985 Planning Packet
Orono
>
Planning Commission
>
1985
>
09-16-1985 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 2:16:50 PM
Creation date
12/1/2022 2:02:19 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO;Planning Commission <br />FROM;Jeanne A. Mabusth <br />Zoning Administrator <br />DATE;March 13, 1984 <br />SUBJECT: #819 William Mills, 200 Loaf Street <br />Preliminary Subdivision <br />ZONING DISTRICT - RR-lB <br />AREA - 5.19 total acres <br />1.19 acres wot <br />4.00 acres dry <br />APPLICATION - Subdivision - plat - 2 lots - Public Hearing 8:30 P.M. <br />The applicant proposes the division of Lot 7, Swan Lake Addition. <br />Both lots appear to satisfy all lot standards for a subdivision <br />of land within the RR-IB zoning district. All structures oxc 'c*-, <br />for a small shed meet the required setback from the newly created <br />lot lino (required setback is 10'). Each lot has adequate access <br />on Leaf Street. Lot 2 is shy 10* of the requ'red 200'. <br />Septic test information has not boon submitted for Lot 1 nor the <br />alternate site tost information for Lot 2. Please review the <br />enclosed staff sketch that designates the required setbacks from <br />the pond (75' setback) and well (75' setback). An alternate <br />septic site could not be located on lot 2 and moot the required <br />setback from both well and pond. <br />1 have sketched an alternate plan that will afford newly proposed <br />Lot 2 suitable area for an alternate septic site. Both lots can <br />be served by the existing driveway. Lot 1 would grant an access <br />easement in favor of Lot 2. <br />Planning Commission should table all action on the subdivxsion <br />application until the applicant has had time to evaluate the septic <br />limitation for Lot 2 and decide if staff's proposal is acceptable. <br />If applicant decides to go with staff sketch then on site septic <br />testing should bo performed within the newly defined lot lines. <br />JAM;il
The URL can be used to link to this page
Your browser does not support the video tag.