My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-16-1985 Planning Packet
Orono
>
Planning Commission
>
1985
>
09-16-1985 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 2:16:50 PM
Creation date
12/1/2022 2:02:19 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i-/ -oi***■ .'(TTVJ , V^O«J= <br />ORONO COMMISSION AND COUNCIL, 22 August 1985 Page 4 <br />which have been agreed upon will be tested through the <br />development of site specific alternative land use <br />scenarios. Following the joint workshop meeting, the City <br />Staff will complete a written summary of the review and <br />analysis of alternative plans for inclusion in the study <br />report. <br />Lead Role <br />The Planning Consultant will be responsible for preparing <br />the alternative development plans which have been <br />identified in this section. The Consultant will also be <br />responsible for presenting these plans to the Planning <br />Commission and City Council. Following the joint meeting <br />to review and discuss the alternative plans, the City staff <br />will be responsible for documenting this process and <br />completing the section of the Study Report which summarizes <br />this phase. <br />PHASE FOUR; Refinement of Selected Alternative. Development of <br />Final Plan <br />The conclusion of Phase Three as stated above, will be the <br />selection of a preferred alternative plan. Depending upon <br />the level of agreement which the City has reached regarding <br />the selected alternative, the refined alternative will <br />either be presented to the Planning Commission at a <br />workshop meeting or the process may skip directly to a <br />joint workshop meeting with the City Council. Once the <br />selected alternative has been refined, the final plan will <br />be prepared along with a written summary of the process <br />which transpired to arrive at it. When this final plan is <br />ready, the Consultant will prepare a summary presentation <br />of the entire process, to be given at a public hearing at <br />the Planning Commission level. When the Planning <br />Commission has arrived at a recommendation regarding the <br />preferred alternative, the Consultant will attend the next <br />City Council meeting to present the final plan. <br />Lead Role <br />The Consultant and the City Staff will share the <br />responsibility for the completion of this phase of the <br />Study. The Consultant will complete the graphic portion of <br />the product and the City Staff will prepare the written <br />portion of the Study with the advice and the counsel of the <br />Consultant. <br />i
The URL can be used to link to this page
Your browser does not support the video tag.