Laserfiche WebLink
ORONO HARDCOVER CALCULATION WORKSHEET ^S7 <br />LAKESHORE <br />SETBACK <br />ZONE <br />A. Existing <br />lot area <br />in zone <br />B.Existing <br />hardcover <br />in zone <br />C. Existing <br />hardcover <br />percentage <br />[(BtA) X 100) <br />D. Proposed <br />hardcover <br />in zone <br />E. Proposed <br />hardcover <br />percentage <br />((DfA) X 100) <br />F. Allo\.ed <br />hardcover <br />percentage <br />li 1 {'O <br />0-75'4800 sf 0 sf 0 0 sf 0 Vr>0 % <br />75-250'12600 s£1148 sf 9.1 1985 sf 15.7 yn 25 Vo <br />250-500 ’9500 sf 286 sf 3.0 %1750 sf 18.4 30 o/ <br />/ <br />500-1000'sf sf %sf /o 35 Vo <br />Directions: <br />A, <br />y r r; r <br />B <br />C <br />D <br />Existing Lot Area in Zone - includes the total square footage of dry buildable land <br />within the specified zone. <br />Existing Hardcover in Zone - includes the square footage of existing roofs, decks, sidewalks, <br />driveways (gravel or paved) and other rain-impervious surfaces within the specified zone. <br />Existing Hardcover Percentage - divide the number in B by the number in A and multiply by 100 <br />Proposed Hardcover in Zone - includes the existing hardcover plus all proposed additional <br />hardcover. - - <br />E <br />F <br />Proposed Hardcover Percentages - divide the number in D by the number in A and multiply by 100. <br />Allowed Hardcover Percentages - if the percentages in column E tor any setback zone exceed <br />the allowed percentages in column F, you should contact the Zoning Department at 473-7357 <br />to discuss th.e possibilities of obtaining a variance. Generally, if a concurrent removal <br />of existing hardcover matches the additional hardcover proposed, resulting in no net increase <br />of hardcover in a specified zone, a variance may not bo necessary.