My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-15-1985 Planning Packet
Orono
>
Planning Commission
>
1985
>
07-15-1985 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 2:08:35 PM
Creation date
12/1/2022 1:47:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
H <br />July 3, 1985 <br />Ms* Mabusth <br />Page 3 <br />As noted at the beginning of this letter, this location will require three <br />variances concerning lakeshore setback, lakeshore hardcover and accessory <br />structure setback. <br />1* Lakeshore Setback <br />This proposed pool location varies from the plan reviewed on June 17 <br />in that is has been moved about 5 feet further away from the lake. <br />The nearest point will be 53 feet from the water. With an average <br />setback of 56 feet, the requested variance would be 19 feet from the <br />required 75 foot setback. This setback would also move the pool <br />outside the DNR 50 foot structure setback. <br />2* Lakeshore Hardcover <br />The requested hardcover has been reduced significately from the plan <br />reviewed on June 17. A total of only 100 sqaure feet within the 75 <br />foot setback is now requested. Of this, 85 square feet will be the <br />pool edge coping strip and 15 square feet will be hard surface deck <br />area. As shown on the attached plan, the only hard surface proposed <br />Is that between the pool and the garage/greenhouse and is almost <br />entirely outside the 75 foot setback. This is for practical reasons <br />of maintenance, pool use and access into the house and storage area. <br />The remainder of the grid shown on the plan will be a pattern of <br />pervious surface where a combination of grass areas and boardwalk <br />will be utilized. The boardwalk will be a wood deck module set on <br />and into a rock bed and flush with the pool and adjacent hard surface <br />A geotechnical filter fabric will underlay the rock to allow water <br />passage thru to the natural soil while acting as a weed/vegetation <br />barrier. The ground form will hold the rainfall/runoff within this <br />rock bed to help control water quality and compensate for the 100 <br />square foot hard surface area within the lakeshore setback (see <br />attached detail). A small 6 inch perforated P.V.C. pipe and filter <br />fabric will be located at a low collection point to allow a slow, <br />controlled outlet for runoff. This water pervious surface will also <br />be used as much as possible beyond the 75 foot setback to reduce <br />potential hard surface coverage, also to help compensate for the <br />requested hard surface within 75 feet. <br />3* Accessory Structure Setback <br />The pool will have a setback of 5’-4" to the greenhouse and 13’-8" <br />to the house/garage* This will require a variance of 4'“8” from <br />the required 10 foot setback for a 16 foot wide area between the pool <br />and greenhouse.
The URL can be used to link to this page
Your browser does not support the video tag.