Laserfiche WebLink
#913 Phillips <br />Pago 2 <br />May 15, 1985 <br />Septic <br />Lots 2 and 4's septic tests confirm suitable area for on-site septic <br />systems. Lot 1 will require additional septic testing to confirm an <br />alternate site. The currtint test conf i rms suitable area for one mound <br />system. Staff suggests future testing shouId be done to north or east <br />of test area. Perming should bo required along road edge to prevent <br />runoff from draining over mound area. Berms will also protect mounds <br />during toad construction. Alternate testing has not been provided <br />for Lot 3; we will require the necessary tests. <br />Drainage Concerns - Review Exhibit L) <br />The wot area to the north of the culvert is created by the runoff from <br />County Road 6. The area serves as a temporary retention area until <br />runoff drains to south side of road to the wet land area on the northwest <br />side of Dickey Lake. To protect the integrity of the building <br />envelope, it will be necessary to determine the effects of a 100 year <br />storm on the bui Idi ng envelope with the present elevations . Once» the <br />capacitv of the retention area is determined, we may recommend <br />specific land alterations to either raise the building site at the <br />stage of site planning or berm around the retention area. A drainage <br />easement will be taken over defined retention area. The area of that <br />retention basin must be excluded frorti dry buildable area for Let 1. <br />Recommendation <br />To reconimend approval of the Ineliminary plat application of Paul <br />Phillips finding all standar<is of the RR—IB zoning district and on­ <br />site septic code have been satisfied based on the following <br />conditions: <br />1. A(lditional sej)tic testing to be completed before applicant is <br />scheduled for Council approval - Lots 1 and 3's alternate test <br />SIt es. <br />2. <br />3. <br />Locate existing septic system on Lot 3. <br />Approva 1 of curb cut by Hennepi nCounty. City to acqu ire dra i nage <br />and utility easement over Outlet A. <br />4 . <br />5. <br />Owner of Lot 4 must grant access easement in favor of Lot 3. <br />Future Levcloper of lands within Medina to be served by private <br />road within Out 1 ot A must obtain a conditicjnal use permit fr<>m the <br />City of Orono prior to construction. <br />6.f.ngineer to sul>iTiit necessary hydrijulic information in order to <br />determine size of retention area on Lot 1 . City will ask that the <br />area be designated as a drainage casement, the City will ask for a <br />Flowage and Conservation Eas<*ment c<v«'r d^’s i «jn.it ed area. <br />7 . <br />8 . <br />Payment of park dedreatior. fee of $600 ($200 each lot). <br />Dedication ol right-of-way of 4C for County Hoad 6. <br />I: <br />f'