My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-18-1990 Planning Packet
Orono
>
Planning Commission
>
1990
>
06-18-1990 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:48:28 AM
Creation date
12/1/2022 9:41:03 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br />I <br />Tb:Mayor Grabek & Orono Council Members <br />Planning Commission Chairman Kelley <br />Orono Planning Commission Members <br />City Administrator Bernhardson <br />Prom:Jeanne A. Mabusth, Building & Zoning Administrator <br />Date:June 13, 1990 <br />Subject: 11532 Fullerton Properties, Inc.,^225 Sixth Ave. N. <br />Preliminary Subdivision “ Continuation of Public Hearing <br />Zoning District - R-lB <br />Total Area - 36.8 acres <br />Additional List of Exhibits <br />Exhibit I <br />Exhibit J <br />Exhibit K <br />Exhibit L <br />Exhibit M <br />Exhibit N <br />Cook Report 6/1/90 <br />CMP 7-15 <br />CMP Map 14 <br />Map of Septic & Building Locations <br />Grading & Drainage Plan <br />Revised Preliminary Plan <br />Lot Configuration <br />The DNR has staked the OHW for Dickey Lake at the 987' <br />elevation. The Minnehaha Creek Watersh*43 Distict has confirmed <br />that this will also be the elevation of the flood plain. Note <br />the water level of Dickey Lake is still at approximately 985+'. <br />On the final plat Dickey Lake shall be shown at the 987' <br />elevation and wetland area surrounding the 987' elevation as <br />drainage easements. <br />All lots meet the 2 acre dry contiguous area requirement as <br />previously discussed at your May meeting. The shared lot line <br />between 6 and 7 has been moved further north to ooen up the <br />building and septic envelope for Lot 7. This has no impact on <br />Lot 6 as the obvious building site and septic locations are to <br />the extreme east of the lot. <br />Staff had originally approached the Planning Commission on <br />the issue of a permanent conditional use permit for the <br />installation of accessory structures on the through lots. Lots 1, <br />2, 4 and 5, Block 1. If this meets with the Planning <br />Commission's approval it should also be noted that all of the <br />pertinent sections of the accessory structure code are <br />applicable and that the following specific setbacks for the <br />installation of accessory structures would be applicable: <br />L.
The URL can be used to link to this page
Your browser does not support the video tag.