Laserfiche WebLink
To; <br />ProB: <br />Dates <br />Mayor Grabek & Orono Council Members <br />Planning Commission Chairman Kelley <br />Orono Planning Commission Members <br />City Administrator Bernhardson <br />Jeanne A. Mabusth, Building & Zoning Administrator <br />June 13, 1990 <br />Subject: #1527 Lyndon S. Bill Stubbs, 2555 Fox Street - <br />Variance - Continuation of Public Hearing <br />List of Additional Exhibits <br />Exhibit I - Planning Commission Minutes of 5/21/90 <br />Exhibit J - Revised Survey Designating Building Envelope <br />and Drainageway <br />Pertinent Ordinance - <br />Section 10.28, Subdivision 5 (B) - <br />Reav-lred = 87,120 s.f. or 2.0 acres <br />Existing Per East Lot Line of Foxwood & Foxwood Addn =» <br />€3,598 s.f. 1.46 acres <br />Total Area of Dry Buildable Exclusive of 15' Wide <br />Drainageway = 1.40 acres (1.04 acres per Auditors <br />Subd. #229 - area of property prior to <br />finalization of torrens action) <br />Status of Application - <br />The applicant's surveyor has submitted a revised survey <br />designating the drainageway and confirming the dry buildable area <br />exclusive of the drainageway. In addition, the revised plan <br />designates the required building envelope. Staff has also <br />defined a 26' setback from the drainageway re-establishing the <br />west line of the building envelope. <br />Staff was also asked to determine a method to regulate the <br />size of the house within this severely limited building envelope <br />as a future residence wi3 1 he limited to 4 bedroom (600 gallon <br />per day use level). The f.t'tic limitations shall automatically <br />piovide controls on the number of bedrooms for a future <br />residence. As for controls on the size of the structure, staff <br />suggests review the following: <br />1. Future owner placed on notice that the water use for the <br />residence structure is limited to 600 gallons per day. <br />Residence must be installed with a meter to determine water <br />use levels. The City will ask that the current owner of the <br />residence submit an annual reading of the meter on <br />approximately June of each year.