Laserfiche WebLink
Zoning File #1516 <br />April 13, 1990 <br />Page 3 of 7 <br />In early discussions with the applicants' <br />Herb Baldwin, staff indicated that ''i^in the boundaries of^t^^ <br />subdivision, the City would ILemenM be granted <br />rvt;\1.e “e%\^“i"nr-i“%rrvlte" ro"dU The applicants have <br />shown this outlot within their proposed plat. <br />Mr. Baldwin was advised that the city would Vt'„^^*io? <br />|re%Yotab^^Vheth« t;t%7ty°would^«^ <br />lt\Va“rL',"Vi“n t“h”e\“ilt^or"y"i?the City's growing awareness of private road issues. <br />in discussions with staff, the Engineer^ini^^^^^ <br />T^^^^to^^he^ cl^ <br />1. Re-alignment of the road outlot for a future westerly <br />continuation. <br />letter of credit would be required. <br />B. Septic System Considerations <br />The new building site is proposed as Lot 2, <br />^rire^L," havt\\%TtVstera^^ suTt^ble for sewage <br />treatment needs of the proposed new house. <br />on Lot 1, Block 1, the ®fi®bing house^is^ inteji^^^^^^ <br />removed^ which is functional mound drainfield, <br />ronVe^srsrr.rh‘av\^%:r9;53ea. rhe,. .r. nor <br />required since this lot exceeds 5 dry acres. <br />T a. “j nirtywV 1 has an existing functional septic system and <br />has a“ea?;d“rt%\iat"e“dra"in,leld lire north o£ the houae.